PARTNERS & INTEGRATIONS

Put permitting and PTO decision intelligence inside the solar workflow.

GridPermit is building a source-backed decision layer for the questions that send solar operations teams into manual research: which authority owns the next step, which permit/interconnection path applies, what changed, and what evidence supports the answer.

Discuss an integration pilotFor solar installersReview our methodology

AHJ + utility separation

Identify the permitting authority and utility as separate approval tracks instead of collapsing both into one vague project status.

Path-changing project facts

Flag when storage, an MPU, existing PV, ground mount, prior work or equipment changes may alter the approval route.

SolarAPP+ eligibility

Check project scope and participating-jurisdiction facts against current first-party SolarAPP+ guidance before choosing the submission path.

Permit / inspection / PTO exceptions

Turn “still waiting” into dated milestones, current owner of the next action, and the missing evidence or correction that must be resolved.

Designed to sit before the handoff

GridPermit is not positioning this layer as a replacement for permit designers, engineers, AHJs, utilities or execution partners. The goal is to improve the decision immediately before the handoff: classify the route, collect the missing facts, show the official evidence, then send the project to the right workflow.

Ingest project context

Address, jurisdiction context, utility, system design and current project milestone where available.

Ask only what is missing

Battery/storage, existing system, MPU/service changes, mount type, revised equipment and other decision facts.

Return a decision card

Approval path, known unknowns, first-party sources, verification date, missing requirement and next responsible authority.

Route execution

Continue into the platform's existing permit, engineering, interconnection, inspection or PTO workflow.

What we will not pretend to know

Unknown stays unknown. If a local requirement, fee, timeline, professional-stamp requirement or project status cannot be verified from a current first-party source or project record, GridPermit should label it rather than infer it from a community anecdote. Project-specific engineering and electrical safety decisions remain with qualified professionals and the responsible authorities.

Integration pilot

A useful first pilot is small: take a set of projects that are off the normal path, compare GridPermit's classification against the partner's existing manual research, and measure whether the decision layer reduces incomplete routing and time spent determining who owns the next action.