Quick findGo anywhere.

Press ↵ to search · Esc to close

The reading room

Solar, made clearer.

Permitting, utility approvals and solar + battery decisions. Explore 17 guides, with sources and clear limits.

Incentives

California SGIP Battery Rebates in 2026: What Is Still Open

A current guide to California SGIP battery funding after the 2025 ratepayer-budget deadline, including AB 209 equity funding and live availability checks.

Jul 27, 2026

Latest Guides

California Plug-In Solar: SB 868 Is Law — Effective Jan. 1, 2027

SB 868 was signed and chaptered on September 30, 2026. Here is what California’s plug-in solar law changes, and what still applies before January 1, 2027.

Sep 9, 2026

Solar Permit vs Utility Interconnection & PTO | GridPermit

Understand the separate city permit, inspection, utility interconnection and Permission to Operate milestones for a solar project.

Sep 9, 2026

El Cerrito Solar Permit Plans: What Should a Service Include?

Before paying for solar permit plans in El Cerrito, separate SolarAPP+ eligibility, City plan requirements, structural scope and PG&E interconnection work.

Sep 9, 2026

El Paso Electric Solar Inspection Failed: REC Meter vs Net Meter

What an EPE field-inspection failure means when REC and revenue meters are far apart, and what to verify before requesting reinspection.

Sep 9, 2026

Long Beach Solar Permit Denied: Express vs Full Review

How to tell whether a Long Beach solar + battery project qualifies for Express permitting or needs full plan review and professional documents.

Sep 9, 2026

PG&E No PTO: Solar Installer Closed or Unavailable

Solar installed but no PG&E permission to operate? Check application status, missing documents and who can finish the file when your installer is unavailable.

Sep 9, 2026

PG&E Zero-Export Solar + Battery: Which Interconnection Path?

How to classify a PG&E zero-export solar and battery project before choosing a Rule 21 application, fee assumption or review timeline.

Sep 9, 2026

Add a Battery to Existing SCE Solar: What to Check

What SCE customers should verify before adding battery storage to existing solar, including local permits, interconnection changes and PTO.

Sep 9, 2026

SolarAPP+ Eligibility: Battery, MPU, Existing PV & Ground Mount

A 2026 SolarAPP+ eligibility guide for storage, main-panel upgrades, existing solar, homeowner installation and ground-mounted PV.

Sep 9, 2026

PG&E Solar Billing Plan and Battery Storage: 2026 Guide

How PG&E’s Solar Billing Plan values imports and exports, why battery dispatch matters, and how to evaluate a 2026 project without assuming payback.

Jul 27, 2026

SDG&E Solar Billing Plan: Rates, Credits & Battery Checks

Find the right SDG&E import rates and export-credit table, separate CCA charges, and check battery quote assumptions before you buy.

Jul 27, 2026

Powerwall 3 vs Enphase IQ Battery 5P: 2026 Guide

A sourced comparison of Powerwall 3 and IQ Battery 5P capacity, power, architecture, warranty, and the project details that determine installed value.

Jul 27, 2026

SCE Solar Billing Plan and Battery Storage: 2026 Guide

How Southern California Edison's Solar Billing Plan values imports and exports, why battery timing matters, and what to verify before estimating savings.

Jul 26, 2026

PG&E Rate Hike Audit 2026: Solar & Battery Protection Analysis

Analysis of Pacific Gas & Electric (PG&E) electricity rate increases and how home battery storage offsets E-ELEC peak pricing.

July 2026

SDG&E Battery Storage ROI Guide 2026: Rates & Economics

San Diego Gas & Electric (SDG&E) battery payback breakdown under NEM 3.0 rules and EV-TOU-5 rate schedules.

July 2026

California NEM 3.0 Solar & Battery Payback Guide (2026 Audit)

Comprehensive guide to California Net Billing Tariff (NEM 3.0), avoided cost rates, TOU arbitrage, and battery ROI.

July 2026

Looking for city-specific permitting facts instead of rate analysis? See our verified California solar permit guides, sourced directly from each city's and utility's own official documentation.