Quick findGo anywhere.

Press ↵ to search · Esc to close

Arkansas / Local permit guide

Little Rock Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Little Rock Building Codes DivisionSource linked
Electric utility
Entergy Arkansas, LLCSource linked
Review time
Up to 30 daysOnly the stated upper bound is verified. The source's project scope and conditions apply.See source scope and conditions below.
See your permit path

Pulaski County ·

Source healthLast verified 2026-08-143 official sources6 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Little Rock Building Codes Division and Entergy Arkansas, LLC before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Little Rock. It does not show the status of a specific project.

  1. 01Permit authorityCity of Little Rock Building Codes DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for Little RockSteps sourced
  4. 04Utility & PTOEntergy Arkansas, LLCUtility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Little Rock Building Codes Division

Local requirements
Electric utility

Interconnection & PTO

Entergy Arkansas, LLC

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects Arkansas residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Up to 30 days

Only the stated upper bound is verified. The source's project scope and conditions apply.

Per Entergy Arkansas's own PSC-filed tariff: after a customer submits a Standard Interconnection Agreement (required at least 30 days before the intended interconnection date), the Company reviews the facility plans and provides written results within 30 calendar days; the same 30-calendar-day review window applies to the optional Preliminary Interconnection Site Review Request. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.85)

Source(s): Rate Schedule No. 71 — Non-Legacy Net-Metering Service (NLN-M)

Battery/solar incentive program on record

No battery/storage incentive program is on record for this locality.

02 / Prepare your application

What you need.

0 of 6 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.9)

Source(s): Divisions — Planning and Development, Rate Schedule No. 71 — Non-Legacy Net-Metering Service (NLN-M)

Permit fees

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

  • Entergy Arkansas Non-Legacy Net-Metering interconnection review fee (Generation Meter under 300kW): $196.75 (one-time, assessed when the Standard Interconnection Agreement is submitted)

    Per Entergy Arkansas's own PSC-filed tariff, Rate Schedule No. 71. Customer is separately responsible for all interconnection study costs.

  • Entergy Arkansas Additional Meter fee: $31.5 (one-time, per additional meter designated for Net-Metering Surplus crediting)

    Per the same tariff.

Sources & confidence

Confidence: High (0.85)

Source(s): Rate Schedule No. 71 — Non-Legacy Net-Metering Service (NLN-M)

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Entergy Arkansas, LLC

Entergy Arkansas is the well-established dominant electric utility for Little Rock, the state capital.

Sources & confidence

Confidence: High (0.9)

Source(s): Net metering services

Generation supplier

Entergy Arkansas, LLC (utility)

Entergy Arkansas is recorded as both the distribution and generation utility.

Sources & confidence

Confidence: Medium (0.6)

Source(s): Net metering services

Interconnection

https://www.entergyarkansas.com/net-metering

Confirmed directly from Entergy Arkansas's own Arkansas Public Service Commission-filed tariff (Rate Schedule No. 71, Non-Legacy Net-Metering Service, effective 3/1/24 with Attachment A revised 3/2/26): excess generation is credited at the Company's Avoided Cost — NOT full retail rate. The exact published Avoided Cost rate: $0.0259/kWh (March 2024-February 2025), $0.0247/kWh (March 2025-February 2026), $0.0334/kWh (March 2026-February 2027), redetermined annually based on the prior calendar year's average Locational Marginal Price in the Company's MISO load zone. 'Non-Legacy' applies to customers who submitted an SIA, Facilities Agreement, or complaint after September 30, 2024; customers with interconnection documents in place by that date retain 'legacy' status under the prior (more favorable) net-metering structure instead.

Confidence: High (0.9)

Permit authority

City of Little Rock Building Codes Division

Part of the Planning and Development department; handles building, plumbing, mechanical, and electrical permitting, plan review, and inspections citywide, via six working sections.

Sources & confidence

Confidence: High (0.9)

Source(s): Divisions — Planning and Development

Permit page: https://littlerock.gov/government/city-departments/planning-and-development/divisions/

Inspection steps

  • The customer shall not commence Parallel Operation of the Net-Metering Facility until it has been inspected and approved by Entergy Arkansas
  • The Standard Interconnection Agreement's own Certification section requires sign-off from the local Building/Electrical Code inspector (of the applicable City/County) confirming the system complies with the National Electrical Code, IEEE standards, the National Electrical Safety Code, and UL listing requirements, or a copy of the final inspection certificate may be attached in lieu of signature
Sources & confidence

Confidence: High (0.85)

Source(s): Rate Schedule No. 71 — Non-Legacy Net-Metering Service (NLN-M)

Eligibility constraints

  • Property types: residential
  • Max system size (AC): 25 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Non-Legacy Net-Metering Service (Arkansas Public Service Commission Rate Schedule No. 71) — for residential customers, generating capacity is capped at the lesser of 25kW or the capacity representing the customer's highest residential usage in the previous 12 months.
  • Other conditions:
    • Net-Metering customers may not simultaneously take service under any other alternative-source-generation, co-generation, or interruptible-service tariff.
    • A Net-Metering Facility may not be modified or changed to generate more electricity than needed to offset the customer's own requirements.
    • Customers whose interconnection documents (SIA, Facilities Agreement, or complaint) were in place by September 30, 2024 retain 'legacy' status under the prior net-metering credit structure instead of this Non-Legacy avoided-cost rate.
Sources & confidence

Confidence: High (0.9)

Source(s): Net metering services, Rate Schedule No. 71 — Non-Legacy Net-Metering Service (NLN-M)

Official contacts

Official contacts

Confidence: High (0.9)

Need a solar installer who handles permits in Little Rock?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Little Rock, Arkansas?

Entergy Arkansas, LLC is the interconnection and distribution utility for Little Rock. The same utility is also listed as the default electricity generation supplier.

How long does a residential solar permit take in Little Rock?

Per Entergy Arkansas's own PSC-filed tariff: after a customer submits a Standard Interconnection Agreement (required at least 30 days before the intended interconnection date), the Company reviews the facility plans and provides written results within 30 calendar days; the same 30-calendar-day review window applies to the optional Preliminary Interconnection Site Review Request. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it. Only the stated upper bound is verified. The source's project scope and conditions apply.

What documents are required for a solar permit in Little Rock?

Commonly required documents include: City of Little Rock building permit application (submitted via the City's Interactive Building-Construction Permit Program portal); Separate electrical permit; Preliminary Interconnection Site Review Request, with a one-line electrical diagram; Standard Interconnection Agreement for Net-Metering Facilities, including a detailed electrical diagram and a signed rate/rules-change disclaimer form; Meter aggregation application form and affidavit; Local Building/Electrical Code inspector sign-off on the Interconnection Agreement's Certification section (or an attached copy of the final inspection certificate).

Who do I contact about solar permits in Little Rock?

City of Little Rock Building Codes Division, phone 501-371-4832, email Permits@littlerock.gov.