Permit authority
City of Lompoc Building & Safety DivisionSource linked
Local pathway
SolarAPP+, subject to Electric Division pre-approvalProject-specific eligibility conditions apply.
See your permit path

Santa Barbara County ·

Source healthLast verified 2026-08-112 official sources4 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Lompoc Building & Safety Division and Electric Division, City of Lompoc before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Lompoc. It does not show the status of a specific project.

  1. 01Permit authorityCity of Lompoc Building & Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for LompocSteps sourced
  4. 04Utility & PTOLompoc Utilities (Electric Division, City of Lompoc)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Lompoc Building & Safety Division

Local requirements
Electric utility

Interconnection & PTO

Lompoc Utilities (Electric Division, City of Lompoc)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

No battery/storage incentive program is on record for this locality.

02 / Prepare your application

What you need.

0 of 3 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.8)

Source(s): SolarAPP+

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Lompoc Utilities (Electric Division, City of Lompoc)

Lompoc has operated its own municipal electric utility since 1923 (originally Lompoc Light & Power), confirmed via the city's own Electric Division page and its membership in the Northern California Power Agency (NCPA). This is a municipal utility, not PG&E or SCE, independently confirmed rather than assumed from county location.

Sources & confidence

Confidence: High (0.85)

Source(s): SolarAPP+

Generation supplier

Lompoc Utilities (Electric Division, City of Lompoc) (utility)

Lompoc is not named among Central Coast Community Energy (3CE)'s member communities on 3CE's own official site. As a municipal utility (operating since 1923, NCPA member), Lompoc does not participate in a CCA the way IOU-served cities do — the city's own municipal utility is both the distribution and generation provider.

Sources & confidence

Confidence: High (0.8)

Source(s): SolarAPP+

Interconnection

https://www.cityoflompoc.com/government/departments/utilities/electric

The City of Lompoc Electric Division's own page, which hosts its full 10-step 'Solar and Self-generation Electric Facility and Energy Storage Installation Information' process, the Self-generating Electric Facility Installation and Interconnection Application, the Interconnection Agreement, and the Customer Owned Generation - Distribution Rate Schedule G-1. As a municipal utility, this replaces a statewide IOU NEM program.

Confidence: High (0.85)

Permit authority

City of Lompoc Building & Safety Division

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.85)

Source(s): SolarAPP+

Permit page: https://www.cityoflompoc.com/government/departments/building-and-safety-division/permits/solar

Inspection steps

  • Request an inspection through the City's 24-hour inspection request line at 805-875-8231, at least one day prior to the desired inspection date
  • Have all approval paperwork and the inspection sheet on site for the inspector

Per the City's own 'SolarAPP+' page, Step 4 (Request Inspection and Interconnectivity).

Sources & confidence

Confidence: High (0.85)

Source(s): SolarAPP+

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarAPP+, subject to Electric Division pre-approval
  • Other conditions:
    • Pre-approval from the Electric Division is required before using SolarAPP+ to apply for a building permit
    • Approval from the Electric Division and a signed Interconnection Agreement are required before signing a contract with a contractor
Sources & confidence

Confidence: Medium (0.55)

Source(s): SolarAPP+

Official contacts

Official contacts
  • City of Lompoc Building & Safety Division, phone: 805-875-8220, official website

Confidence: Medium (0.65)

Need a solar installer who handles permits in Lompoc?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Lompoc, California?

Lompoc Utilities (Electric Division, City of Lompoc) is the interconnection and distribution utility for Lompoc. The same utility is also listed as the default electricity generation supplier.

What documents are required for a solar permit in Lompoc?

Commonly required documents include: PV Installation and Interconnection Application (submitted to City of Lompoc Electric Utility division); Signed/initialed 'Customer Owned Generation Rate Schedule G-1'; SolarAPP+ approval documents (downloaded after SolarAPP+ submittal and fee payment).

Who do I contact about solar permits in Lompoc?

City of Lompoc Building & Safety Division, phone 805-875-8220.