California / Local permit guide

Martinez Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Martinez Building DivisionSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
SolarAPP+Project-specific eligibility conditions apply.
Review time
0–3 daysSee source scope and conditions below.
See your permit path

Contra Costa County · Explore related utility guides

Source healthLast verified 2026-10-086 official sources4 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Martinez Building Division and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Martinez. It does not show the status of a specific project.

  1. 01Permit authorityCity of Martinez Building DivisionAuthority sourced
  2. 02DocumentsNo complete checklist on fileNot verified
  3. 03InspectionInspection guidance for MartinezSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Martinez Building Division

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

0–3 days

The City's current Solar Permits page says eligible SolarAPP+ residential permits are processed within 72 hours and generally in less than 24 hours. Projects outside SolarAPP+ follow a separate submission path.

Sources & confidence

Confidence: High (0.9)

Source(s): Solar Permits

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

Not yet verified.

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Martinez is a well-documented Contra Costa County city within PG&E's core Northern California service territory.

Sources & confidence

Confidence: High (0.9)

Source(s): Solar Permits

Generation supplier

MCE (Marin Clean Energy) (Community Choice Aggregator)

MCE's own service-area page confirms Martinez as one of 16 Contra Costa County communities it serves (alongside Concord, Danville, El Cerrito, Hercules, Lafayette, Moraga, Oakley, Pinole, Pittsburg, Pleasant Hill, Richmond, San Pablo, San Ramon, Walnut Creek, and unincorporated Contra Costa County). PG&E continues to deliver the power and provide billing/customer service.

Sources & confidence

Confidence: High (0.85)

Source(s): Service Area

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Martinez Building Division

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.8)

Source(s): Solar Permits

Permit page: https://www.cityofmartinez.org/departments/building/solar-permits

Inspection steps

  • Call 925-372-3596 (weekdays, 8:00 a.m. to 4:00 p.m.) to schedule inspections
Sources & confidence

Confidence: Medium (0.65)

Source(s): Solar Permits

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarAPP+
  • Other conditions:
    • SolarAPP+ covers single-family and up to two-unit residential units only; multi-family and commercial systems do not qualify
Sources & confidence

Confidence: Medium (0.65)

Source(s): Solar Permits

Official contacts

Official contacts
  • City of Martinez Building Division (Inspections), phone: 925-372-3596, official website

Confidence: Medium (0.7)

Need a solar installer who handles permits in Martinez?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Martinez, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Martinez. The default electricity generation supplier is MCE (Marin Clean Energy), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).

How long does a residential solar permit take in Martinez?

The City's current Solar Permits page says eligible SolarAPP+ residential permits are processed within 72 hours and generally in less than 24 hours. Projects outside SolarAPP+ follow a separate submission path.

Who do I contact about solar permits in Martinez?

City of Martinez Building Division (Inspections), phone 925-372-3596.