- Permit authority
- City of Menlo Park Community Development Department, Building DivisionSource linked
- Electric utility
- Pacific Gas and Electric Company (PG&E)Source linked
- Local pathway
- Photovoltaic Real Time (PRT) Permit (SB 379 automated real-time process)Project-specific eligibility conditions apply.
- Review time
- Not yet verified.
San Mateo County · Explore related utility guides
Jump to a section
Planning a new solar project? See the homeowner quote option →
Research coverage
Your permit path,
at a glance.
This shows what GridPermit has verified for Menlo Park. It does not show the status of a specific project.
- 01Permit authorityCity of Menlo Park Community Development Department, Building DivisionAuthority sourced
- 02DocumentsChecklist includes conditional itemsConditions apply
- 03InspectionInspection guidance for Menlo ParkSteps sourced
- 04Utility & PTOPacific Gas and Electric Company (PG&E)Utility path sourced
01 / Know your path
Two approvals.
One project.
Permit & inspection
City of Menlo Park Community Development Department, Building Division
Local requirementsA local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.
How to read this guide
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Sources & confidence
02 / Prepare your application
What you need.
Sources & confidence
Permit fees
The page states processor (SolarApp+) fees apply but does not state the City's own permit fee amount.
Not yet verified.
Rebates on record
Rebates on record
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas and Electric Company (PG&E)
Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Sources & confidence
Generation supplier
WestLight Energy (formerly Peninsula Clean Energy) - ECOplus (default) (Community Choice Aggregator)
Confirmed directly via the City of Menlo Park's own page: 'WestLight Energy is the official electricity service provider for energy customers in San Mateo County.' The default product is ECOplus (50% renewable); ECO100 (100% renewable) is available as an opt-up tier; customers may also opt out entirely back to PG&E generation.
Sources & confidence
Interconnection
PG&E's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other PG&E-territory records in this dataset.
Inspection steps
- Request inspection through the Accela Citizen Access (ACA) portal after construction completion
Sources & confidence
Eligibility constraints
- Property types: residential
- Max system size (AC): 38.4 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Photovoltaic Real Time (PRT) Permit (SB 379 automated real-time process)
- Other conditions:
- Single-family residential, roof-mounted, new installations only (no upgrades or additions)
- Maximum system capacity 38.4 kW
- Electrical service must be 400A or less with no panel upgrades, and include a 225A disconnect switch and bus bars
- Applicant must be a California-licensed contractor
- Projects including battery storage or EV charger installations are currently ineligible for the automated real-time process
- Menlo Park Fire Protection District approval is required before City permit issuance
Sources & confidence
Official contacts
Official contacts
- City of Menlo Park Building Permits, phone: 650-330-6704, official website
- City of Menlo Park Building Inspections, phone: 650-330-6767, official website
- Menlo Park Fire Protection District, phone: 650-688-8400, official website
- SGIP Program Administrator (PG&E territory), official website
Need a solar installer who handles permits in Menlo Park?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.
Official sources
Official sources
- Photovoltaic Real Time (PRT) Permit, City of Menlo Park (government). Accessed 2026-08-05.
- WestLight Energy (formerly Peninsula Clean Energy), City of Menlo Park (government). Accessed 2026-08-05.
- PG&E's Electric Service Territory, Pacific Gas and Electric Company (utility). Accessed 2026-08-05.
- Net Energy Metering (NEM) Program, Pacific Gas and Electric Company (utility). Accessed 2026-08-05.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Menlo Park, California?
Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Menlo Park. The default electricity generation supplier is WestLight Energy (formerly Peninsula Clean Energy) - ECOplus (default), a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).
What documents are required for a solar permit in Menlo Park?
Commonly required documents include: Site plan with ESS and grounding locations; Proposed and existing roof plans; Installation details and electrical one-line drawing with wire sizes; PV labeling plan; Building permit application form; Structural calculations and electrical load calculations; All product specifications; Menlo Park Fire Protection District approval letter.
Who do I contact about solar permits in Menlo Park?
City of Menlo Park Building Permits, phone 650-330-6704.
Related cities
Related cities
Other verified cities related to Menlo Park. See all cities on the California solar permit guide index.
- Atherton, Pacific Gas & Electric (PG&E)
- Belmont, Pacific Gas & Electric (PG&E)
- Burlingame, Pacific Gas and Electric Company (PG&E)
- Daly City, Pacific Gas and Electric Company (PG&E)
- East Palo Alto, Pacific Gas and Electric Company (PG&E)
- Foster City, Pacific Gas & Electric (PG&E)