California / Local permit guide
Modesto Solar Permit Guide
Your local requirements. The official sources. A clearer next step.
- Permit authority
- City of Modesto Building Safety DivisionSource linked
- Electric utility
- Modesto Irrigation District (MID)Source linked
- Local pathway
- Expedited Solar Photovoltaic Permitting (one- or two-family dwellings)Project-specific eligibility conditions apply.
- Review time
- Not yet verified.
Jump to a section
Planning a new solar project? See the homeowner quote option →
Research coverage
Your permit path,
at a glance.
This shows what GridPermit has verified for Modesto. It does not show the status of a specific project.
01 / Know your path
Two approvals.
One project.
A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.
How to read this guide
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
No battery/storage incentive program is on record for this locality.
02 / Prepare your application
What you need.
Sources & confidence
Permit fees
- Electrical Photovoltaic - Residential: $333 (flat fee (per permit))
The City’s current Building Safety Fees page lists Electrical Photovoltaic — Residential at $333 per permit for July 1, 2026 through June 30, 2027.
Sources & confidence
Rebates on record
Rebates on record
Not yet verified.
Utility and generation supplier
Utility
Modesto Irrigation District (MID)
MID is an independent, publicly-owned (municipal) electric utility serving Modesto, distinct from PG&E. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Sources & confidence
Generation supplier
Modesto Irrigation District (MID) (utility)
Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Sources & confidence
Interconnection
https://www.mid.org/saving-energy-money/solar/
Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Inspection steps
- Inspections are conducted from the ground up in a specific defined order; you may not move forward in construction without passing each inspection
- Building Inspectors will not take inspection requests over the phone or in the field; schedule through the E-TRAKIT Permits Portal instead
- The City is unable to accommodate appointments
This is the City's general Building Safety Division inspection process (the same page covers all building permit types, including solar); the City does not publish a separate, solar-specific inspection sequence.
Sources & confidence
Eligibility constraints
- Property types: residential
- Max system size (AC): 10 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Expedited Solar Photovoltaic Permitting (one- or two-family dwellings)
- Other conditions:
- System size must be 10 kW AC (CEC rating) or less
- Roof-mounted on a one- or two-family dwelling; utility-interactive, without battery storage
- Roof must have a single roof covering without a reroof overlay
- Access pathways at least 3 feet wide are required between multiple arrays
- Panel fire classification must be provided and meet the rating required for the structure
- MID also allows solar systems sized up to 115% of a customer's demonstrated load (for customers with 12+ months of service history)
Sources & confidence
Official contacts
Official contacts
- City of Modesto Building Safety Division, phone: 209-577-5232, email: odiaz@modestogov.com, official website
- Modesto Irrigation District (MID) Energy Services Department, phone: (209) 526-7582, official website
Need a solar installer who handles permits in Modesto?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.
Official sources
Official sources
- Building Safety Division, City of Modesto (government). Accessed 2026-08-05.
- Solar Program, Modesto Irrigation District (utility). Accessed 2026-08-05.
- Building Inspections, City of Modesto (government). Accessed 2026-08-09.
- Building Safety Fees — Effective July 1, 2026 to June 30, 2027, City of Modesto (government). Accessed 2026-10-08.
- Forms & Applications, City of Modesto (government). Accessed 2026-10-08.
- Eligibility Checklist for Expedited Solar Permitting, City of Modesto (government). Accessed 2026-10-08.
Frequently Asked Questions
What utility serves solar customers in Modesto, California?
Modesto Irrigation District (MID) is the interconnection and distribution utility for Modesto. The same utility is also listed as the default electricity generation supplier.
What documents are required for a solar permit in Modesto?
Commonly required documents include: Checklist for Expedited Residential Photovoltaic Systems (via Forms & Applications).
Who do I contact about solar permits in Modesto?
City of Modesto Building Safety Division, phone 209-577-5232, email odiaz@modestogov.com.