Quick findGo anywhere.

Press ↵ to search · Esc to close

California / Local permit guide

Paradise Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
Town of Paradise Building DivisionSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
SolarApp+ automated roof-mount solar permittingProject-specific eligibility conditions apply.
Review time
Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
See your permit path

Butte County · Explore related utility guides

Source healthLast verified 2026-08-095 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with Town of Paradise Building Division and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Paradise. It does not show the status of a specific project.

  1. 01Permit authorityTown of Paradise Building DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for ParadiseSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

Town of Paradise Building Division

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Same-day review for eligible expedited-permit projects

No verified standard-path permit timeline is available.

The Town's own SolarAPP+ page states that once approved plans are submitted with a SolarAPP+ approval ID, contractors 'submit their approved plans to the Town of Paradise and instantly receive a permit.'

Sources & confidence

Confidence: High (0.8)

Source(s): Online Roof Mount Solar Permits Now Available with SolarApp+

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 1 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: Medium (0.75)

Source(s): Online Roof Mount Solar Permits Now Available with SolarApp+

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Paradise is confirmed to be within PG&E's electric service territory.

Sources & confidence

Confidence: High (0.85)

Source(s): Online Roof Mount Solar Permits Now Available with SolarApp+

Generation supplier

Not yet verified.

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

Inspection steps

  • Schedule online at app.govwell.com/paradise with permit number, jobsite address, inspection type, preferred date/time (AM or PM), jobsite contact phone, and any special access instructions
Sources & confidence

Confidence: High (0.8)

Source(s): Online Roof Mount Solar Permits Now Available with SolarApp+

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarApp+ automated roof-mount solar permitting
  • Other conditions:
    • Limited to licensed B-General, C-10 Electrical, or C-46 Solar Photovoltaic contractors
    • Covers only new rooftop solar photovoltaic on detached one- and two-family dwellings, townhomes, and related accessory structures (e.g. garage or ADU)
Sources & confidence

Confidence: High (0.8)

Source(s): Online Roof Mount Solar Permits Now Available with SolarApp+

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Paradise?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Paradise, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Paradise.

How long does an expedited-eligible residential solar permit take in Paradise?

The Town's own SolarAPP+ page states that once approved plans are submitted with a SolarAPP+ approval ID, contractors 'submit their approved plans to the Town of Paradise and instantly receive a permit.' No verified standard-path permit timeline is available.

What documents are required for a solar permit in Paradise?

Commonly required documents include: SolarApp+ approved plans (downloaded after automated review and processing fee payment).

Who do I contact about solar permits in Paradise?

Town of Paradise Building Resiliency Center, phone 530-872-6291, email building@townofparadise.com.