Redwood City Solar Permit Guide
Pacific Gas and Electric Company (PG&E) territory · San Mateo County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
0–3 days
Redwood City Code Section 9.216(A): 'The Building Official shall issue a building permit or other nondiscretionary permit the same day for over-the-counter applications or within one (1) to three (3) business days of receipt of a complete application...for electronic applications.'
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas and Electric Company (PG&E)
Generation supplier
WestLight Energy (formerly Peninsula Clean Energy) - ECOplus (default) (Community Choice Aggregator)
Redwood City is the headquarters location of WestLight Energy/Peninsula Clean Energy per multiple sources this session, and is a San Mateo County city. San Mateo County's CCA program enrolls all county jurisdictions' customers by default (opt-out model), consistent with the default-enrollment pattern directly confirmed for other San Mateo County cities (e.g. South San Francisco, Daly City) this session, though redwoodcity.org itself returned HTTP 403 to automated fetch and could not be directly read to confirm Redwood City's own page content.
Interconnection
PG&E's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other PG&E-territory records in this dataset.
Required documents
- Standard Plan and Checklist (per the California Solar Permitting Guidebook), adopted by the City Building Department (required when: always)
Inspection steps
- Submit an online building inspection request via eTRAKiT, providing the permit number, project address, inspection type(s), and contact name/number
- Inspections are available Monday-Friday 9am-4pm; check Today's Building Inspections after 9am on the day of your inspection for your estimated 2-hour arrival window
- Cancellations can currently also be made by calling the Inspection Line at (650) 780-7361
This is the City's general Building Division inspection-scheduling process (the same page covers all building permit types, including solar); the City does not publish a separate, solar-specific inspection sequence.
Eligibility constraints
- Property types: residential, duplex
- Max system size (AC): 10 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: 30 kW
- Program/pathway: Expedited Residential Rooftop Solar Energy Systems permitting (City Code Ch. 9, Article XII)
- Other conditions:
- System must be installed on a single- or duplex-family dwelling
- Solar panel/module array must not exceed the maximum legal building height as defined by the City
- Only one consolidated inspection is required for eligible systems, scheduled within 2 business days of request
- Approval cannot be conditioned on approval of an association (HOA)
Official contacts
- SGIP Program Administrator (PG&E territory), official website
Need a solar installer who handles permits in Redwood City?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- SolarAPP+ Automatic Permitting, City of Redwood City (government). Accessed 2026-08-05.
- PG&E's Electric Service Territory, Pacific Gas and Electric Company (utility). Accessed 2026-08-05.
- WestLight Energy (Homepage) - 'Peninsula Clean Energy is now WestLight Energy', WestLight Energy (formerly Peninsula Clean Energy) (other_official). Accessed 2026-08-05.
- Net Energy Metering (NEM) Program, Pacific Gas and Electric Company (utility). Accessed 2026-08-05.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- Schedule a Building Inspection, City of Redwood City (government). Accessed 2026-08-11.
- Article XII - Residential Rooftop Solar Energy Systems (Redwood City City Code, Chapter 9 - Buildings), City of Redwood City (via Municode official code host) (government). Accessed 2026-08-11.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Redwood City, California?
Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Redwood City. The default electricity generation supplier is WestLight Energy (formerly Peninsula Clean Energy) - ECOplus (default), a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).
How long does a residential solar permit take in Redwood City?
Redwood City Code Section 9.216(A): 'The Building Official shall issue a building permit or other nondiscretionary permit the same day for over-the-counter applications or within one (1) to three (3) business days of receipt of a complete application...for electronic applications.'
What documents are required for a solar permit in Redwood City?
Commonly required documents include: Standard Plan and Checklist (per the California Solar Permitting Guidebook), adopted by the City Building Department.
Who do I contact about solar permits in Redwood City?
SGIP Program Administrator (PG&E territory).
Related California cities
Other verified cities related to Redwood City. See all cities on the California solar permit guide index.
- Atherton, Pacific Gas & Electric (PG&E)
- Belmont, Pacific Gas & Electric (PG&E)
- Burlingame, Pacific Gas and Electric Company (PG&E)
- Daly City, Pacific Gas and Electric Company (PG&E)
- East Palo Alto, Pacific Gas and Electric Company (PG&E)
- Foster City, Pacific Gas & Electric (PG&E)