Electric utility
Pacific Gas and Electric Company (PG&E)Source linked
Local pathway
Not yet verified.
Review time
Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
See your permit path

Contra Costa County · Explore related utility guides

Source healthLast verified 2026-08-039 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Richmond Building Division (Community Development Department) and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Richmond. It does not show the status of a specific project.

  1. 01Permit authorityCity of Richmond Building Division (Community Development Department)Authority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for RichmondSteps sourced
  4. 04Utility & PTOPacific Gas and Electric Company (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Richmond Building Division (Community Development Department)

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas and Electric Company (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Same-day review for eligible expedited-permit projects

No verified standard-path permit timeline is available.

The City's own SolarAPP+ page states 'An instant permit will be created for the user when all conditions below are satisfied' (valid CSLB license, valid City Business Tax Certificate, and the required SolarAPP+/application attachments uploaded), and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'

Sources & confidence

Confidence: High (0.8)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 5 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.85)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas and Electric Company (PG&E)

Richmond's own MCE Clean Energy page confirms: 'PG&E will continue to deliver electricity through their power lines and provide residents and businesses with gas service.' PG&E is the underlying transmission/distribution/billing utility; MCE is a separate default generation supplier — see generation_supplier.

Sources & confidence

Confidence: High (0.85)

Source(s): MCE Clean Energy Programs | Richmond, CA

Generation supplier

MCE (Marin Clean Energy) - Light Green (60% renewable, standard/default service) (Community Choice Aggregator)

Richmond's own page states: 'Since 2013, the City of Richmond has partnered with Contra Costa County's community-based electricity provider, Marin Clean Energy (MCE)' with 'MCE "Light Green" 60% renewable energy (standard service; automatic enrollment and competitive rates with PG&E).'

Sources & confidence

Confidence: High (0.9)

Source(s): MCE Clean Energy Programs | Richmond, CA

Interconnection

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Same PG&E-wide Net Energy Metering program URL already verified for the Fremont/Oakland/Berkeley records — reused as a utility-level fact. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.6)

Permit authority

City of Richmond Building Division (Community Development Department)

Sources & confidence

Confidence: High (0.85)

Source(s): Residential Solar Systems | Richmond, CA

Permit page: https://www.ci.richmond.ca.us/2771/Residential-Solar-Systems

Inspection steps

  • Submit design through the SolarAPP+ platform to receive a SolarAPP+ Approval ID
  • Apply for the building permit via the City's iMS online permitting system, referencing the SolarAPP+ Approval ID
  • Schedule an inspection via the Automated Phone Inspection Scheduling System or electronic request

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.75)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Eligibility constraints

Not yet verified.

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Richmond?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Richmond, California?

Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Richmond. The default electricity generation supplier is MCE (Marin Clean Energy) - Light Green (60% renewable, standard/default service), a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).

How long does an expedited-eligible residential solar permit take in Richmond?

The City's own SolarAPP+ page states 'An instant permit will be created for the user when all conditions below are satisfied' (valid CSLB license, valid City Business Tax Certificate, and the required SolarAPP+/application attachments uploaded), and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.' No verified standard-path permit timeline is available.

What documents are required for a solar permit in Richmond?

Commonly required documents include: Current, valid CSLB contractor license; Current, valid City of Richmond Business Tax Certificate (Business License); SolarAPP+ Approval Documents (attachment); Signed permit application ('PAF Permit Application' attachment); Certificate of Appropriateness from the Planning Division.

Who do I contact about solar permits in Richmond?

City of Richmond Building Division, phone 510-620-6868, email permittechs@ci.richmond.ca.us.