Richmond Solar Permit Guide

Pacific Gas and Electric Company (PG&E) territory · Contra Costa County

✓ Last verified 2026-08-039 official sources
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Richmond Building Division (Community Development Department) and PG&E before making a decision.

Overview

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Same-day review for eligible expedited-permit projects

No verified standard-path permit timeline is available.

The City's own SolarAPP+ page states 'An instant permit will be created for the user when all conditions below are satisfied' (valid CSLB license, valid City Business Tax Certificate, and the required SolarAPP+/application attachments uploaded), and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'

Confidence: High (0.8)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Confidence: High (0.9)

Source(s): SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

Permit fees

Not yet verified.

Rebates

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas and Electric Company (PG&E)

Confidence: High (0.85)

Source(s): MCE Clean Energy Programs | Richmond, CA

Generation supplier

MCE (Marin Clean Energy) - Light Green (60% renewable, standard/default service) (Community Choice Aggregator)

Richmond's own page states: 'Since 2013, the City of Richmond has partnered with Contra Costa County's community-based electricity provider, Marin Clean Energy (MCE)' with 'MCE "Light Green" 60% renewable energy (standard service; automatic enrollment and competitive rates with PG&E).'

Confidence: High (0.9)

Source(s): MCE Clean Energy Programs | Richmond, CA

Interconnection

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Same PG&E-wide Net Energy Metering program URL already verified for the Fremont/Oakland/Berkeley records — reused as a utility-level fact. pge.com returns HTTP 403 to automated fetch; confirmed to exist via search engine indexing under its expected title.

Confidence: Medium (0.6)

Permit authority

City of Richmond Building Division (Community Development Department)

Confidence: High (0.85)

Source(s): Residential Solar Systems | Richmond, CA

Permit page: https://www.ci.richmond.ca.us/2771/Residential-Solar-Systems

Required documents

  • Current, valid CSLB contractor license (required when: always)
  • Current, valid City of Richmond Business Tax Certificate (Business License) (required when: always)
  • SolarAPP+ Approval Documents (attachment) (required when: always)
  • Signed permit application ('PAF Permit Application' attachment) (required when: always)
  • Certificate of Appropriateness from the Planning Division (required when: conditional)

Confidence: High (0.85)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Inspection steps

  • Submit design through the SolarAPP+ platform to receive a SolarAPP+ Approval ID
  • Apply for the building permit via the City's iMS online permitting system, referencing the SolarAPP+ Approval ID
  • Schedule an inspection via the Automated Phone Inspection Scheduling System or electronic request

This is the SolarAPP+ application workflow described on Richmond's own SolarAPP+ page, not a field-inspection checklist — no separate document describing what inspectors check in the field was located this session.

Confidence: Medium (0.75)

Source(s): SolarAPP+ For Solar Installers | Richmond, CA

Eligibility constraints

Not yet verified.

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Richmond?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.

Sources

Frequently Asked Questions

What utility serves solar customers in Richmond, California?

Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Richmond. The default electricity generation supplier is MCE (Marin Clean Energy) - Light Green (60% renewable, standard/default service), a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).

How long does an expedited-eligible residential solar permit take in Richmond?

The City's own SolarAPP+ page states 'An instant permit will be created for the user when all conditions below are satisfied' (valid CSLB license, valid City Business Tax Certificate, and the required SolarAPP+/application attachments uploaded), and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.' No verified standard-path permit timeline is available.

What documents are required for a solar permit in Richmond?

Commonly required documents include: Current, valid CSLB contractor license; Current, valid City of Richmond Business Tax Certificate (Business License); SolarAPP+ Approval Documents (attachment); Signed permit application ('PAF Permit Application' attachment); Certificate of Appropriateness from the Planning Division.

Who do I contact about solar permits in Richmond?

City of Richmond Building Division, phone 510-620-6868, email permittechs@ci.richmond.ca.us.