San Francisco Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · San Francisco County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
No battery/storage incentive program is on record for this locality.
Permit fees
- Residential solar permit fee cap (systems up to 15kW, under AB 1132): $450 (flat)
AB 1132 caps residential solar permit fees at $450 for systems up to 15kW, effective through 2034.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
CleanPowerSF (Community Choice Aggregator)
CleanPowerSF, operated by the San Francisco Public Utilities Commission (SFPUC), is the default electricity generation provider for San Francisco (except customers already directly served by SFPUC). PG&E continues to own and operate the electric grid, deliver electricity, and issue a single combined monthly bill that includes CleanPowerSF's generation charges in place of PG&E's own generation charges.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- SolarAPP+ Approval ID, Inspection Checklist, and Specification Sheet (required when: SolarAPP+-eligible projects (existing single/two-family R3 homes, 4kWdc and under, PV-only, no ballasted/ground-mount, no new service/panel upgrade))
- Plan drawings (required when: Solar Permit and PV Plans electrical permit applications)
- Data sheets (required when: Solar Permit and PV Plans electrical permit applications)
- Structural drawings and calculations, stamped and signed by a California-licensed civil or structural engineer (roof coverings, framing type/size/spacing, panel weight/support/attachment method, any roof-strengthening framing, site-specific structural calculations, and racking-system documentation) (required when: Solar Permit and PV Plans electrical permit applications)
Inspection steps
- Every San Francisco solar installation requires a mandatory SF Fire Department inspection before DBI's electrical inspection can proceed
- Some system types may also require a separate DBI building inspection
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ (for existing single/two-family R3 homes) or standard DBI plan submittal
- Other conditions:
- Some projects require both an electrical permit and a building permit; others can obtain an electrical permit via SolarAPP+ or by submitting plans directly to DBI
Official contacts
- San Francisco Department of Building Inspection (DBI), official website
- CleanPowerSF, official website
Need a solar installer who handles permits in San Francisco?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Get a permit for a solar photovoltaic system, City and County of San Francisco (government). Accessed 2026-08-09.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- How It Works, CleanPowerSF (San Francisco Public Utilities Commission) (other_official). Accessed 2026-08-08.
Frequently Asked Questions
What utility serves solar customers in San Francisco, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for San Francisco. The default electricity generation supplier is CleanPowerSF, a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
What documents are required for a solar permit in San Francisco?
Commonly required documents include: SolarAPP+ Approval ID, Inspection Checklist, and Specification Sheet; Plan drawings; Data sheets; Structural drawings and calculations, stamped and signed by a California-licensed civil or structural engineer (roof coverings, framing type/size/spacing, panel weight/support/attachment method, any roof-strengthening framing, site-specific structural calculations, and racking-system documentation).
Who do I contact about solar permits in San Francisco?
San Francisco Department of Building Inspection (DBI).
Related California cities
Other verified cities related to San Francisco. See all cities on the California solar permit guide index.
- Albany, Pacific Gas & Electric (PG&E)
- American Canyon, Pacific Gas & Electric (PG&E)
- Antioch, Pacific Gas & Electric (PG&E)
- Arroyo Grande, Pacific Gas & Electric (PG&E)
- Arvin, Pacific Gas & Electric (PG&E)
- Atascadero, Pacific Gas & Electric (PG&E)