San Ramon Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Contra Costa County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
MCE (Marin Clean Energy) (Community Choice Aggregator)
MCE's own service-area page confirms San Ramon as one of 16 Contra Costa County communities it serves (alongside Concord, Danville, El Cerrito, Hercules, Lafayette, Martinez, Moraga, Oakley, Pinole, Pittsburg, Pleasant Hill, Richmond, San Pablo, Walnut Creek, and unincorporated Contra Costa County). PG&E continues to deliver the power and provide billing/customer service.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- Plot Plan (lot dimensions, building locations, setbacks, north arrow, adjacent streets/driveways, panel location) (required when: always)
- Panel weight, quantity, coverage area, and equipment listing (UL-certified) (required when: always)
- Existing roofing material type and weight, attachment specifications (roof-mounted systems) (required when: conditional)
- Structural calculations (required when: conditional)
Inspection steps
- A ladder is required for all inspections, extending 18 inches above the roof edge and secured at the top
- Contractors must verify the existing main service panel is safe and free of electrical hazards
- Reinspection fees apply for repeated failures, failing to appear during the assigned window, or lacking required access equipment
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ (residential, roof-mounted, retrofit systems)
- Other conditions:
- Structural calculations required when panel installation weight exceeds 5 pounds per square foot
- Applicants should confirm zoning requirements with the Planning Division before starting
Official contacts
- City of San Ramon Building and Safety Services, phone: 925-973-2580, email: PermitCenter@SanRamon.ca.gov, official website
Need a solar installer who handles permits in San Ramon?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Residential Solar Photovoltaic, City of San Ramon (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- Service Area, MCE (Marin Clean Energy) (other_official). Accessed 2026-08-08.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in San Ramon, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for San Ramon. The default electricity generation supplier is MCE (Marin Clean Energy), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
What documents are required for a solar permit in San Ramon?
Commonly required documents include: Plot Plan (lot dimensions, building locations, setbacks, north arrow, adjacent streets/driveways, panel location); Panel weight, quantity, coverage area, and equipment listing (UL-certified); Existing roofing material type and weight, attachment specifications (roof-mounted systems); Structural calculations.
Who do I contact about solar permits in San Ramon?
City of San Ramon Building and Safety Services, phone 925-973-2580, email PermitCenter@SanRamon.ca.gov.
Related California cities
Other verified cities related to San Ramon. See all cities on the California solar permit guide index.