Permit authority
City of Scotts Valley Building DepartmentSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
SolarAPP+ automated solar and energy storage systems plan reviewProject-specific eligibility conditions apply.
See your permit path

Santa Cruz County · Explore related utility guides

Source healthLast verified 2026-08-098 official sources4 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Scotts Valley Building Department and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Scotts Valley. It does not show the status of a specific project.

  1. 01Permit authorityCity of Scotts Valley Building DepartmentAuthority sourced
  2. 02DocumentsNo complete checklist on fileNot verified
  3. 03InspectionInspection guidance for Scotts ValleySteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Scotts Valley Building Department

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

Not yet verified.

Permit fees

  • Residential Solar / PV Permit (1-15 kWh): $450 (flat fee)

    Per the City's own Master Fee Schedule FY 2026-27.

  • Residential Solar / PV Permit (over 15 kWh): $15 (per kWh over 15)

    Per the City's own Master Fee Schedule FY 2026-27; charged in addition to the base 1-15 kWh fee.

Sources & confidence

Confidence: High (0.85)

Source(s): Master Fee Schedule FY 26/27

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Scotts Valley is a well-documented Santa Cruz County city within PG&E's core Northern California service territory.

Sources & confidence

Confidence: High (0.85)

Source(s): Building Department

Generation supplier

Central Coast Community Energy (3CE) (Community Choice Aggregator)

3CE's own official site confirms Scotts Valley as one of its member communities. PG&E continues to deliver the power and provide billing/customer service.

Sources & confidence

Confidence: High (0.85)

Source(s): About Us — Service Area

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Scotts Valley Building Department

Sources & confidence

Confidence: High (0.85)

Source(s): Building Department

Permit page: https://www.scottsvalley.gov/208/Building-Department

Inspection steps

  • Log in to the ViewPoint Cloud portal (guests must be added by the applicant)
  • Under My Account, go to Applications, select the application, then the inspection you want to request, and click '+ New Appointment'
  • A confirmation is sent within 24 to 48 hours

This is the City's general Building Department inspection scheduling process (the same page covers all building permit types, including solar); the City does not publish a separate, solar-specific inspection sequence.

Sources & confidence

Confidence: Medium (0.7)

Source(s): How to Schedule an Inspection

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarAPP+ automated solar and energy storage systems plan review
  • Other conditions:
    • Reviewed under the 2025 California Building Codes, effective January 1, 2026 (replacing the 2022 codes)
Sources & confidence

Confidence: Medium (0.7)

Source(s): Building Department

Official contacts

Official contacts

Confidence: High (0.8)

Need a solar installer who handles permits in Scotts Valley?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Scotts Valley, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Scotts Valley. The default electricity generation supplier is Central Coast Community Energy (3CE), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).

Who do I contact about solar permits in Scotts Valley?

City of Scotts Valley Building Permit Technician, email svbuildingdepartment@scottsvalley.gov.