Quick findGo anywhere.

Press ↵ to search · Esc to close

California / Local permit guide

Selma Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Selma Building DepartmentSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
Automated Solar Permitting (SolarAPP+)Project-specific eligibility conditions apply.
Review time
Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
See your permit path

Fresno County · Explore related utility guides

Source healthLast verified 2026-08-106 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Selma Building Department and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Selma. It does not show the status of a specific project.

  1. 01Permit authorityCity of Selma Building DepartmentAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for SelmaSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Selma Building Department

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Same-day review for eligible expedited-permit projects

No verified standard-path permit timeline is available.

The City's own SolarAPP+ page states SolarAPP+-eligible systems receive 'instantaneous permit issuance once permit application is completed.'

Sources & confidence

Confidence: High (0.85)

Source(s): Automated Solar Permitting

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 1 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: Medium (0.7)

Source(s): Automated Solar Permitting

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Selma is a well-documented Fresno County city within PG&E's core Northern California service territory.

Sources & confidence

Confidence: High (0.85)

Source(s): Automated Solar Permitting

Generation supplier

Not yet verified.

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Selma Building Department

Sources & confidence

Confidence: High (0.85)

Source(s): Automated Solar Permitting

Permit page: https://cityofselma.com/departments/departments/building/automated_solar_permitting.php

Inspection steps

  • Call the 24-Hour Inspection Request Line at (559) 891-2220, providing jobsite address, permit number, requested inspection date, inspection type, name, and contact info; requests must be left before 3:30pm for next-day inspection
  • Have the permit, job card, City-approved plans, and any prior 'Outcome of Inspection' notices available on-site, and provide a ladder if roof/attic access is needed

This is the City's general Building Division inspection-request process (the same page covers all building permit types, including solar); the City does not publish a separate, solar-specific inspection sequence.

Sources & confidence

Confidence: High (0.8)

Source(s): Inspections

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Automated Solar Permitting (SolarAPP+)
  • Other conditions:
    • Eligible system types: PV, PV+storage, BIPV, and BIPV+storage
    • Up to 3 free revisions to the application are permitted
Sources & confidence

Confidence: High (0.8)

Source(s): Automated Solar Permitting

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Selma?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Selma, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Selma.

How long does an expedited-eligible residential solar permit take in Selma?

The City's own SolarAPP+ page states SolarAPP+-eligible systems receive 'instantaneous permit issuance once permit application is completed.' No verified standard-path permit timeline is available.

What documents are required for a solar permit in Selma?

Commonly required documents include: Selma Permit Center / OpenGov application submittal.

Who do I contact about solar permits in Selma?

City of Selma Building Department, phone 559-891-2208.