City of Tracy Building Safety DivisionSource linked
Electric utility
Pacific Gas and Electric Company (PG&E)Source linked
See your permit path

San Joaquin County · Explore related utility guides

Source healthLast verified 2026-08-059 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Tracy Building Safety Division and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Tracy. It does not show the status of a specific project.

  1. 01Permit authorityCity of Tracy Building Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for TracySteps sourced
  4. 04Utility & PTOPacific Gas and Electric Company (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Tracy Building Safety Division

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas and Electric Company (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 7 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.9)

Source(s): Electronic Photovoltaic Plan Review Submittal Requirements (revised January 21, 2026)

Permit fees

  • Solar (PV) System - Residential (up to 15kW): $450 (flat fee)

    Per the City's own FY2026-2027 Citywide Master Fee Schedule (state-mandated fee).

  • Solar (PV) System - Residential (per kW above 15kW): $15 (per additional kW)

    Per the City's own FY2026-2027 Citywide Master Fee Schedule (state-mandated fee).

Sources & confidence

Confidence: High (0.9)

Source(s): Approved FY2026-2027 Citywide Master Fee Schedule

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas and Electric Company (PG&E)

Tracy is a San Joaquin County city; PG&E is already confirmed as the utility for other San Joaquin County cities in this dataset (Stockton, Lodi, Manteca). Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.75)

Source(s): Net Energy Metering (NEM) Program

Generation supplier

Not yet verified.

Interconnection

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

PG&E's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other PG&E-territory records in this dataset.

Confidence: Medium (0.6)

Permit authority

City of Tracy Building Safety Division

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.9)

Source(s): Permit Process and Fees

Permit page: https://www.cityoftracy.org/Departments/Community-and-Economic-Development/Building-Safety/Permit-Process-and-Fees

Inspection steps

  • Request inspections via e-TRAKiT or by calling (209) 831-6400 (Monday-Thursday 8:00am-6:00pm, and every other Friday 8:00am-5:00pm), providing the building permit number or address and inspection type

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.7)

Source(s): Building Safety / eTRAKiT Residential Online Permitting

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Electronic Photovoltaic Plan Review (Community & Economic Development, Building Safety Division)
  • Other conditions:
    • Applies to Residential R-3 and R-3.1 occupancies
    • Submittals with missing or non-compliant items are rejected outright
Sources & confidence

Confidence: Medium (0.6)

Source(s): Electronic Photovoltaic Plan Review Submittal Requirements (revised January 21, 2026)

Official contacts

Official contacts
  • City of Tracy Building Safety Division (inspection scheduling), phone: (209) 831-6400, official website
  • SGIP Program Administrator (PG&E territory), official website

Confidence: Medium (0.7)

Need a solar installer who handles permits in Tracy?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Tracy, California?

Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Tracy.

What documents are required for a solar permit in Tracy?

Commonly required documents include: Completed Building Permit Application (new submittals) or Resubmittal/Revision Form; All plans (drawings) combined into one PDF, 11"x17" format, properly sorted and oriented; Specification sheets for modules, inverters, optimizers, micro-inverters, RSS relays, combiner boxes, disconnects, racking systems, roof stand-offs, flashings, and sealants; Scaled site plan (min. 1/8"=1') with roof plan view showing access points, setbacks, pathways, vents, fireplaces, and furnace/water heater vents; Single-line electrical diagram (strings/modules per string, combiner boxes, conductor/conduit type and size, inverter model, load centers); Main service panel rating, busbar rating, and backfed breaker overcurrent protection rating; Conductor ampacity calculations, complete labeling schedule, bonding/grounding lug type, manufacturer listing information, and clear interior photos of the electrical service panel.

Who do I contact about solar permits in Tracy?

City of Tracy Building Safety Division (inspection scheduling), phone (209) 831-6400.