California / Local permit guide

Willits Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Willits Building & SafetySource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
See your permit path

Mendocino County · Explore related utility guides

Source healthLast verified 2026-10-087 official sources4 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Willits Building & Safety and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Willits. It does not show the status of a specific project.

  1. 01Permit authorityCity of Willits Building & SafetyAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for WillitsSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Willits Building & Safety

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 3 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.95)

Source(s): Building & Safety, Residential Rooftop Photovoltaic Guide

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Willits is confirmed to be within PG&E's electric service territory — independently checked rather than assumed, since neighboring Ukiah (also Mendocino County) operates its own municipal electric utility.

Sources & confidence

Confidence: High (0.85)

Source(s): Building & Safety

Generation supplier

Sonoma Clean Power (SCP) (Community Choice Aggregator)

Willits, a Mendocino County city, is therefore served by SCP. PG&E continues to deliver the power and provide billing/customer service. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.85)

Source(s): Who We Are

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Willits Building & Safety

Sources & confidence

Confidence: High (0.85)

Source(s): Building & Safety

Permit page: https://cityofwillits.org/141/Building-Safety

Inspection steps

  • Inspections conducted Mondays-Thursdays 10am-4pm; requests must be made at least 24 hours in advance by counter, phone, or email
Sources & confidence

Confidence: Medium (0.7)

Source(s): Building & Safety

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Standardized permit submittal for residential (one- and two-family dwellings and legally permitted accessory buildings) roof-mounted PV systems
  • Other conditions:
    • Additional requirements apply if the project is in a historical district, subject to a homeowner's association, or is a ground-mount system
Sources & confidence

Confidence: Medium (0.65)

Source(s): Building & Safety

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Willits?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Willits, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Willits. The default electricity generation supplier is Sonoma Clean Power (SCP), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).

What documents are required for a solar permit in Willits?

Commonly required documents include: Completed Residential Rooftop Photovoltaic Guide / checklist; PV plans showing array layout, access pathways, roof attachment and system information; Signed completed checklist submitted with the application.

Who do I contact about solar permits in Willits?

City of Willits Building Department, phone 707-459-7112, email aojeda@cityofwillits.org.