Chicago Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Chicago Department of BuildingsSource linked
Electric utility
Commonwealth Edison (ComEd)Source linked
Review time
1 daysSee source scope and conditions below.
See your permit path

Cook County ·

Source healthLast verified 2026-08-133 official sources6 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Chicago Department of Buildings and ComEd before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Chicago. It does not show the status of a specific project.

  1. 01Permit authorityCity of Chicago Department of BuildingsAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for ChicagoSteps sourced
  4. 04Utility & PTOCommonwealth Edison (ComEd)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Chicago Department of Buildings

Local requirements
Electric utility

Interconnection & PTO

Commonwealth Edison (ComEd)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects Illinois residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

1 days

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.8)

Source(s): Small Installations and the Easy Permit Process

Battery/solar incentive program on record

ComEd Distributed Generation (DG) Rebate — Energy Storage

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: Medium (0.5)

Source(s): Small Installations and the Easy Permit Process

02 / Prepare your application

What you need.

0 of 3 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.9)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program)

Permit fees

  • Express Permit Program (EPP) solar PV permit fee: $275 (flat fee)

    Per the City's own page: the EPP fee schedule was reduced 25% from $375 to $275 for qualifying projects when the program was improved in 2013. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.7)

Source(s): Small Installations and the Easy Permit Process

Rebates on record

Rebates on record

ComEd Distributed Generation (DG) Rebate — Solar

ComEd's own Residential Net Metering FAQ states ComEd offers a Distributed Generation (DG) Rebate of $300 per kW of installed capacity for eligible renewable generation systems.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: Medium (0.7)

Source(s): Green Power Connection — Residential Net Metering Frequently Asked Questions (NMR03-23)

Utility and generation supplier

Utility

Commonwealth Edison (ComEd)

ComEd is the dominant investor-owned electric utility for northern Illinois including the City of Chicago; this record's own permit terms explicitly reference ComEd electrical service connections.

Sources & confidence

Confidence: High (0.95)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program)

Generation supplier

Commonwealth Edison (ComEd) (utility)

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.55)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program)

Interconnection

https://www.comed.com/smart-energy-innovation/energy-technology/net-metering

The mechanics described here (application process, credit rollover, SREC allocation via the Illinois Power Agency) are treated as still-current process facts; the specific credit VALUE/rate a new applicant receives today should be confirmed directly with ComEd before relying on it. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.75)

Permit authority

City of Chicago Department of Buildings

Illinois has no single statewide residential solar permitting rule — permitting authority sits with the local municipality (inside its corporate/home-rule boundaries) or the county (in unincorporated areas). Chicago's Department of Buildings is the Authority Having Jurisdiction (AHJ) for the City of Chicago specifically.

Sources & confidence

Confidence: High (0.95)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program)

Permit page: https://www.chicago.gov/city/en/sites/guide-to-building-permits/home/terms-and-conditions/epp/worktype/SOLAR.html

Inspection steps

  • A pre-submission, in-person existing-condition inspection (structural + electrical) is required before the permit application is even filed
  • Post-installation, the system must be inspected by both the Chicago Department of Buildings and ComEd before it may be energized
  • A permanent rapid-shutdown label must be installed and verifiable at inspection if the system includes a rapid shutdown system, per the Chicago Fire Prevention Code
  • Any existing electrical deficiencies (including grounding/bonding) must be corrected by the licensed electrical contractor before solar equipment is connected
Sources & confidence

Confidence: High (0.85)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program), Small Installations and the Easy Permit Process

Eligibility constraints

  • Property types: residential
  • Max system size (AC): 13.44 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Express Permit Program (EPP) for roof-mounted systems under 13.44 kW output; standard plan review otherwise
  • Other conditions:
    • EPP is roof-mounted only — it does not authorize wall-attached or ground-mounted solar PV components
    • EPP energy storage systems are capped at 20 kWh (10 kWh for non-lithium-ion batteries); only one installation is allowed per ComEd electrical service connection
    • Equipment may not be installed within 3 feet of a residential building's roof edge (4 feet for non-residential/mixed-use)
    • Electrical work must be performed by a Chicago-licensed electrical contractor; where required by Illinois law, work must be performed under a certified Illinois distributed generation installer (Illinois Commerce Commission) and roofing work under a valid Illinois roofing contractor license (IL Dept. of Financial and Professional Regulation)
Sources & confidence

Confidence: High (0.9)

Source(s): Terms and Conditions for Small-Scale Solar Photovoltaic (PV) System (Express Permit Program)

Official contacts

Official contacts

Confidence: Medium (0.7)

Need a solar installer who handles permits in Chicago?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Chicago, Illinois?

Commonwealth Edison (ComEd) is the interconnection and distribution utility for Chicago. The same utility is also listed as the default electricity generation supplier.

How long does a residential solar permit take in Chicago?

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

What documents are required for a solar permit in Chicago?

Commonly required documents include: Structural design prepared and stamped by an Illinois-licensed architect or structural engineer; In-person existing-condition inspection report confirming (1) the structural capacity of the existing roof and (2) the condition of the existing electrical system, performed by the licensed architect/structural engineer or someone under their responsible control; Manufacturer's installation instructions for all primary electrical equipment (must be NRTL-listed and labeled).

Who do I contact about solar permits in Chicago?

City of Chicago Department of Buildings.