Utah / Local permit guide

Salt Lake City Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
Salt Lake City Building ServicesSource linked
Electric utility
Rocky Mountain PowerSource linked
Local pathway
Not yet verified.
See your permit path

Salt Lake County ·

Source healthLast verified 2026-10-084 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with Salt Lake City Building Services and Rocky Mountain Power before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Salt Lake City. It does not show the status of a specific project.

  1. 01Permit authoritySalt Lake City Building ServicesAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for Salt Lake CitySteps sourced
  4. 04Utility & PTORocky Mountain PowerUtility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

Salt Lake City Building Services

Local requirements
Electric utility

Interconnection & PTO

Rocky Mountain Power

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects Utah residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

No battery/storage incentive program is on record for this locality.

02 / Prepare your application

What you need.

0 of 4 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.9)

Source(s): Solar PV Systems Packet

Permit fees

Current City solar-panel permit fees are published by system-size bracket in the FY2027 Consolidated Fee Schedule.

  • Solar panel permit — 0–5 kW: $264 (permit fee)

    Current FY2027 Salt Lake City Consolidated Fee Schedule.

  • Solar panel permit — 6–10 kW: $463 (permit fee)

    Current FY2027 Salt Lake City Consolidated Fee Schedule.

  • Solar panel permit — 11–50 kW: $529 (permit fee)

    Current FY2027 Salt Lake City Consolidated Fee Schedule.

  • Solar panel permit — 51–100 kW: $1190 (permit fee)

    Current FY2027 Salt Lake City Consolidated Fee Schedule.

Sources & confidence

Confidence: High (0.98)

Source(s): FY2027 Consolidated Fee Schedule

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Rocky Mountain Power

Rocky Mountain Power (a PacifiCorp company) is the dominant investor-owned electric utility across the Wasatch Front, including Salt Lake City.

Sources & confidence

Confidence: High (0.9)

Source(s): Rooftop Solar — Utah Rooftop Solar Rates Explained

Generation supplier

Rocky Mountain Power (utility)

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: Medium (0.55)

Source(s): Rooftop Solar — Utah Rooftop Solar Rates Explained

Interconnection

https://commerce.utah.gov/ocs/rooftop-solar/

Utah's rooftop-solar customer classification is governed by a settlement agreement and Utah Public Service Commission order, summarized on the Utah Department of Commerce Office of Consumer Services' own page: customers fall into one of three tiers based on when their complete interconnection application was submitted to Rocky Mountain Power — Net-Metered (NEM) if before 2017-11-15, Transition if 2017-11-15 through 2020-10-30, and Post-Transition/Export Credit if after 2020-10-30 (the tier all new applicants fall under today). Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: High (0.85)

Permit authority

Salt Lake City Building Services

Utah has no single statewide residential solar permitting portal — permitting authority sits with the local municipality (inside its boundaries) or the county (in unincorporated areas). Salt Lake City's own Building Services division is the permitting authority within city limits.

Sources & confidence

Confidence: High (0.95)

Source(s): Solar PV

Permit page: https://www.slc.gov/buildingservices/solar-pv/

Inspection steps

  • Review covers four separate areas: Building Code (roof compliance, weatherproofing, engineered mounting), Structural (roof framing analysis required for systems exceeding 5 psf), Electrical (component certification and configuration verification), and Fire Safety (access pathways, disconnect placement, weather-resistant labeling)
  • Zoning review also applies, covering setback requirements and historic district considerations
Sources & confidence

Confidence: High (0.85)

Source(s): Solar PV Systems Packet

Eligibility constraints

  • Property types: residential
  • Max system size (AC): 15 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Not yet verified.
  • Other conditions:
    • Components must be UL listed and identified for the application
    • Maximum 4 series strings per inverter
    • System total capacity may not exceed 15 kW
    • Inverter output limited to 13,440 watts continuous AC power
    • AC connection point must be on the load side of the service disconnecting means
    • Zoning setback requirement of 6 feet minimum
    • Fire-safety access pathway minimum of 3 feet to the roof ridge
Sources & confidence

Confidence: High (0.9)

Source(s): Solar PV Systems Packet

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Salt Lake City?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Salt Lake City, Utah?

Rocky Mountain Power is the interconnection and distribution utility for Salt Lake City. The same utility is also listed as the default electricity generation supplier.

What documents are required for a solar permit in Salt Lake City?

Commonly required documents include: Completed Solar PV Packet / Solar PV Application form; Site plan showing major component locations and clearances; Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, and disconnects; Structural worksheet.

Who do I contact about solar permits in Salt Lake City?

Salt Lake City Building Services, phone 801-535-6000.