Loudoun County Solar Permit Guide
Dominion Energy Virginia territory · Loudoun County
Overview
GridPermit collects Virginia residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
No battery/storage incentive program is on record for this locality.
Permit fees
- Building Permit: $230 (flat fee)
Per the County's own Solar Permits page.
- Zoning Permit: $165 (flat fee — ground-mounted systems only)
Per the County's own Solar Permits page; not required for roof-mounted systems on an existing structure.
- Electrical Permit: $70 (flat fee)
Per the County's own Solar Permits page.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Dominion Energy Virginia
Generation supplier
Dominion Energy Virginia (utility)
No Community Choice Aggregator was found serving Loudoun County's residential solar customers this session; Dominion Energy Virginia is recorded as both the distribution and default generation utility for the portion of the county it serves — see the utility field notes on the genuine Dominion/NOVEC split within the county.
Required documents
- Construction drawings — three sets of wet-sealed plans showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signage, AC connection to the building, and attachment detail (required when: always)
- Specification sheets and installation manuals for all components (required when: always)
- A plat depicting the ground-mounted array's location relative to property boundaries (required when: for ground-mounted systems (required for the zoning permit))
- Building/Zoning Permit Application and a separate Electrical Permit Application (required when: always)
Inspection steps
- Inspections are scheduled through LandMARC
- Inspections occur between 8:30 a.m. and 3:00 p.m., Monday through Friday
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Not yet verified.
- Other conditions:
- Homeowners may pull the permit themselves using a 'Statement of Owner/Lessee License Exemption,' or hire a licensed Virginia State Contractor
- Ground-mounted systems require an additional zoning permit; roof-mounted systems on an existing structure do not
Official contacts
- Loudoun County Department of Building and Development, phone: 703-777-0220, official website
Need a solar installer who handles permits in Loudoun County?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Solar Permits, Loudoun County, Virginia (government). Accessed 2026-08-13.
- Virginia Uniform Statewide Building Code (USBC), Virginia Department of Housing and Community Development (DHCD) (government). Accessed 2026-08-13.
- Net Metering, Dominion Energy Virginia (utility). Accessed 2026-08-13.
Frequently Asked Questions
What utility serves solar customers in Loudoun County, Virginia?
Dominion Energy Virginia is the interconnection and distribution utility for Loudoun County. The default electricity generation supplier is Dominion Energy Virginia, a utility, separate from Dominion Energy Virginia.
What documents are required for a solar permit in Loudoun County?
Commonly required documents include: Construction drawings — three sets of wet-sealed plans showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signage, AC connection to the building, and attachment detail; Specification sheets and installation manuals for all components; A plat depicting the ground-mounted array's location relative to property boundaries; Building/Zoning Permit Application and a separate Electrical Permit Application.
Who do I contact about solar permits in Loudoun County?
Loudoun County Department of Building and Development, phone 703-777-0220.