Choose SolarAPP+ or standard plan check, then obtain separate fire approval. SCE PTO remains separate.

Electric utility
Southern California Edison (SCE)Source linked
Local pathway
SolarApp+ (optional, single-family roof-mounted) / standard plan check (alternative)Project-specific eligibility conditions apply.
See your permit path

San Bernardino County · Explore related utility guides

Source healthLast verified 2026-08-058 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Chino Hills Building & Safety Division and SCE before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Chino Hills. It does not show the status of a specific project.

  1. 01Permit authorityCity of Chino Hills Building & Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for Chino HillsSteps sourced
  4. 04Utility & PTOSouthern California Edison (SCE)Utility path sourced

Paid referral disclosure: GridPermit has a paid referral relationship with CompareSolarPrices. If you use this link and later complete a qualifying action, GridPermit may receive compensation.

Want a solar quote after reviewing the permit requirements in Chino Hills?

Continue to CompareSolarPrices to request a homeowner solar quote for Chino Hills.

Have a recent electricity bill ready. CompareSolarPrices will ask you to confirm your contact details and receipt of its quote. Submit those details only on its website, not to GridPermit.

You will continue on CompareSolarPrices' website. GridPermit is not the installer.

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Chino Hills Building & Safety Division

Local requirements
Electric utility

Interconnection & PTO

Southern California Edison (SCE)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 3 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.85)

Source(s): Residential Solar Roof-Mounted Permit Process

Permit fees

SolarApp+ submissions separately incur a third-party administrative fee charged by SolarApp+ itself, not a city fee. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

  • Photovoltaic Permit - Single-Family Home, Roof Mounted: $450 (flat)

    Per Gov Code 66015. General Plan Surcharge Fee and Technology Fee (6% of building fees) also apply.

  • Photovoltaic Permit - Multi-Family or Commercial, Roof Mounted: $1000 (flat)

    Per Gov Code 66015.

  • Photovoltaic Permit - Residential, Ground Mounted: $450 (flat)

    Per Gov Code 66015.

  • Photovoltaic Permit - Commercial, Ground Mounted: $1000 (flat)

    Per Gov Code 66015.

  • Energy Storage System (not integrated with PV system): $269 (flat)
Sources & confidence

Confidence: High (0.9)

Source(s): Building Services Fee Schedule (effective July 1, 2026)

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Southern California Edison (SCE)

SCE's own 'Incorporated Cities and Counties Served by SCE' fact sheet (updated 3/17/2025) explicitly lists 'Chino Hills' by name among the cities in its service area.

Sources & confidence

Confidence: High (0.9)

Source(s): Incorporated Cities and Counties Served by SCE

Generation supplier

Not yet verified.

Interconnection

https://www.sce.com/clean-energy-efficiency/solar-generating-your-own-power/billing-incentives/net-energy-metering

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.6)

Permit authority

City of Chino Hills Building & Safety Division

Sources & confidence

Confidence: High (0.9)

Source(s): Residential Solar Roof-Mounted Permit Process

Permit page: https://www.chinohills.org/1926/Residential-Solar

Inspection steps

  • Inspections occur during the installation process to verify compliance with approved plans

The city's page describes this in general terms without a specific step-by-step scheduling procedure.

Sources & confidence

Confidence: Medium (0.5)

Source(s): Residential Solar Roof-Mounted Permit Process

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarApp+ (optional, single-family roof-mounted) / standard plan check (alternative)
  • Other conditions:
    • Applies to single-family (roof-mounted) solar installations
    • SolarApp+ use is optional; an alternative standard plan-check method is also available
    • Chino Valley Fire District approval must be applied for separately
Sources & confidence

Confidence: High (0.8)

Source(s): Residential Solar Roof-Mounted Permit Process

Official contacts

Official contacts

Confidence: High (0.85)

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Chino Hills, California?

Southern California Edison (SCE) is the interconnection and distribution utility for Chino Hills.

What documents are required for a solar permit in Chino Hills?

Commonly required documents include: Project-specific SolarApp+ approval documentation (for SolarApp+ applicants); Chino Valley Fire District approved project plans (separate submittal); Signed Smoke and Carbon Monoxide Detector/Alarm form (upon plan approval, for SolarApp+ applicants).

Who do I contact about solar permits in Chino Hills?

City of Chino Hills Building & Safety Division, phone 909-364-2780, email communitydevelopment@chinohills.org.