Quick findGo anywhere.

Press ↵ to search · Esc to close

California / Local permit guide

City of Industry Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Electric utility
Southern California Edison (SCE)Source linked
Review time
0–3 daysSee source scope and conditions below.
See your permit path

Los Angeles County · Explore related utility guides

Source healthLast verified 2026-08-118 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with Los Angeles County Department of Public Works, Building and Safety Division and SCE before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for City of Industry. It does not show the status of a specific project.

  1. 01Permit authorityLos Angeles County Department of Public Works, Building and Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for City of IndustrySteps sourced
  4. 04Utility & PTOSouthern California Edison (SCE)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

Los Angeles County Department of Public Works, Building and Safety Division

Local requirements
Electric utility

Interconnection & PTO

Southern California Edison (SCE)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

0–3 days

LA County Code Chapter 68, Section 6803: 'Upon receipt of a complete small residential rooftop solar energy system application, plan check review will be completed within one to three business days.'

Sources & confidence

Confidence: High (0.85)

Source(s): Chapter 68 - Expedited Permitting for Small Residential Rooftop Solar Energy Systems (Los Angeles County Code, Title 26 - Building Code)

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 2 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.8)

Source(s): Chapter 68 - Expedited Permitting for Small Residential Rooftop Solar Energy Systems (Los Angeles County Code, Title 26 - Building Code)

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Southern California Edison (SCE)

The City of Industry is confirmed to be within SCE's distribution service territory.

Sources & confidence

Confidence: High (0.85)

Source(s): Los Angeles County Building & Safety

Generation supplier

Southern California Edison (SCE) (utility)

Clean Power Alliance's own homepage states it serves '38 communities across Los Angeles and Ventura counties' and names each one individually via its site's community directory; City of Industry is not among the named communities. No other Los Angeles/Ventura County CCA serving City of Industry was found, so Southern California Edison (SCE) is recorded as both the distribution and generation utility.

Sources & confidence

Confidence: Medium (0.75)

Source(s): Homepage (community directory listing all 38 CPA member communities)

Interconnection

https://www.sce.com/clean-energy-efficiency/solar-generating-your-own-power/billing-incentives/net-energy-metering

SCE's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other SCE-territory records this dataset.

Confidence: Medium (0.6)

Permit authority

Los Angeles County Department of Public Works, Building and Safety Division

The City of Industry does not operate its own building department; per the city's own site, all building, electrical, mechanical, and plumbing permits — including solar — are issued by LA County Building & Safety, operating out of a satellite office within City of Industry.

Sources & confidence

Confidence: High (0.85)

Source(s): Los Angeles County Building & Safety

Permit page: https://www.cityofindustry.org/182/Los-Angeles-County-Building-Safety

Inspection steps

  • A single combination inspection covers the structural, electrical, and plumbing components of the solar installation
  • Evidence of correct installation/labeling must be provided at inspection (the Building Official may require exposure of roof-mount fastening, panel grounding/bonding, and module/inverter nameplates if not otherwise verifiable)
  • If the system fails inspection, subsequent inspections are authorized until the work is approved

Per LA County Code Chapter 68, Section 6806 (Inspections).

Sources & confidence

Confidence: High (0.8)

Source(s): Chapter 68 - Expedited Permitting for Small Residential Rooftop Solar Energy Systems (Los Angeles County Code, Title 26 - Building Code)

Eligibility constraints

  • Property types: residential, duplex
  • Max system size (AC): 10 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: 30 kW
  • Program/pathway: Expedited Permitting for Small Residential Rooftop Solar Energy Systems (LA County Code Title 26, Chapter 68)
  • Other conditions:
    • System must be installed on a one- or two-family dwelling
    • Solar panel/module array must not exceed the maximum legal building height per LA County Planning and Zoning Code
    • Photovoltaic systems must be listed for the application per the Electrical Code; solar thermal systems must be certified by the Solar Rating and Certification Corporation or an approved listing agency
Sources & confidence

Confidence: High (0.85)

Source(s): Chapter 68 - Expedited Permitting for Small Residential Rooftop Solar Energy Systems (Los Angeles County Code, Title 26 - Building Code)

Official contacts

Official contacts
  • Los Angeles County Building & Safety (City of Industry satellite office), phone: 626-333-2211, official website

Confidence: High (0.8)

Need a solar installer who handles permits in City of Industry?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in City of Industry, California?

Southern California Edison (SCE) is the interconnection and distribution utility for City of Industry. The same utility is also listed as the default electricity generation supplier.

How long does a residential solar permit take in City of Industry?

LA County Code Chapter 68, Section 6803: 'Upon receipt of a complete small residential rooftop solar energy system application, plan check review will be completed within one to three business days.'

What documents are required for a solar permit in City of Industry?

Commonly required documents include: Permit application meeting Building Code Section 106.4 requirements; Plans conforming to the checklist and standard plans in LA County Building Code Manual 6807, Article 1 (per the California Solar Permitting Guidebook).

Who do I contact about solar permits in City of Industry?

Los Angeles County Building & Safety (City of Industry satellite office), phone 626-333-2211.