Quick findGo anywhere.

Press ↵ to search · Esc to close

California / Local permit guide

Dixon Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Permit authority
City of Dixon Building DivisionSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
SolarAPP+ (standard residential rooftop solar and energy storage systems)Project-specific eligibility conditions apply.
Review time
Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
See your permit path

Solano County · Explore related utility guides

Source healthLast verified 2026-08-095 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Dixon Building Division and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Dixon. It does not show the status of a specific project.

  1. 01Permit authorityCity of Dixon Building DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for DixonSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Dixon Building Division

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

Same-day review for eligible expedited-permit projects

No verified standard-path permit timeline is available.

The City's own SolarApp+ Permitting Instructions page states that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'

Sources & confidence

Confidence: Medium (0.75)

Source(s): SolarApp+ Permitting Instructions

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 4 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.85)

Source(s): SolarApp+ Permitting Instructions

Permit fees

The page states the initial SolarAPP+ fee covers up to three revisions but does not state a specific dollar amount.

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Dixon is a well-documented Solano County city within PG&E's core Northern California service territory.

Sources & confidence

Confidence: High (0.9)

Source(s): SolarApp+ Permitting Instructions

Generation supplier

Not yet verified.

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Dixon Building Division

Sources & confidence

Confidence: High (0.9)

Source(s): SolarApp+ Permitting Instructions

Permit page: https://www.cityofdixonca.gov/solarapp

Inspection steps

  • Call the building inspection request line at 707-678-7005 (24-hour)
  • Provide permit number, address, inspection type, and preferred timing (AM or PM)
Sources & confidence

Confidence: High (0.85)

Source(s): SolarApp+ Permitting Instructions

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarAPP+ (standard residential rooftop solar and energy storage systems)
  • Other conditions:
    • Projects not meeting SolarAPP+ Eligibility Checklist criteria must follow the Residential Rooftop Solar PV handout process instead
Sources & confidence

Confidence: High (0.8)

Source(s): SolarApp+ Permitting Instructions

Official contacts

Official contacts

Confidence: High (0.9)

Need a solar installer who handles permits in Dixon?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Dixon, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Dixon.

How long does an expedited-eligible residential solar permit take in Dixon?

The City's own SolarApp+ Permitting Instructions page states that eligible projects use 'the automated SolarAPP+ portal for instant permitting.' No verified standard-path permit timeline is available.

What documents are required for a solar permit in Dixon?

Commonly required documents include: Load calculations with electrical panel photos; Smoke/CO2 self-certification form; SolarAPP+ approval document; Electronic signature.

Who do I contact about solar permits in Dixon?

City of Dixon Building Division, phone 707-678-7000, email buildingdivision@cityofdixonca.gov.