Dixon Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Solano County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Same-day review for eligible expedited-permit projects
No verified standard-path permit timeline is available.
The City's own SolarApp+ Permitting Instructions page states that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
Not yet verified.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- Load calculations with electrical panel photos (required when: always)
- Smoke/CO2 self-certification form (required when: always)
- SolarAPP+ approval document (required when: always)
- Electronic signature (required when: always)
Inspection steps
- Call the building inspection request line at 707-678-7005 (24-hour)
- Provide permit number, address, inspection type, and preferred timing (AM or PM)
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ (standard residential rooftop solar and energy storage systems)
- Other conditions:
- Projects not meeting SolarAPP+ Eligibility Checklist criteria must follow the Residential Rooftop Solar PV handout process instead
Official contacts
- City of Dixon Building Division, phone: 707-678-7000, email: buildingdivision@cityofdixonca.gov, official website
Need a solar installer who handles permits in Dixon?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- SolarApp+ Permitting Instructions, City of Dixon (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Dixon, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Dixon.
How long does an expedited-eligible residential solar permit take in Dixon?
The City's own SolarApp+ Permitting Instructions page states that eligible projects use 'the automated SolarAPP+ portal for instant permitting.' No verified standard-path permit timeline is available.
What documents are required for a solar permit in Dixon?
Commonly required documents include: Load calculations with electrical panel photos; Smoke/CO2 self-certification form; SolarAPP+ approval document; Electronic signature.
Who do I contact about solar permits in Dixon?
City of Dixon Building Division, phone 707-678-7000, email buildingdivision@cityofdixonca.gov.
Related California cities
Other verified cities related to Dixon. See all cities on the California solar permit guide index.