Permit authority
City of Fairfield Building Safety DivisionSource linked
Electric utility
Pacific Gas & Electric (PG&E)Source linked
Local pathway
SolarAPP+ (residential roof-mounted, retrofit systems) via eTRAKiTProject-specific eligibility conditions apply.
Review time
0–1 daysSee source scope and conditions below.
See your permit path

Solano County · Explore related utility guides

Source healthLast verified 2026-08-096 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Fairfield Building Safety Division and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Fairfield. It does not show the status of a specific project.

  1. 01Permit authorityCity of Fairfield Building Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for FairfieldSteps sourced
  4. 04Utility & PTOPacific Gas & Electric (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Fairfield Building Safety Division

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas & Electric (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

0–1 days

The City's own page states 'A permit application that previously took days or weeks for review can now be approved instantly and issued the next business day,' and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'

Sources & confidence

Confidence: High (0.8)

Source(s): SolarAPP+ for Solar Installers

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 4 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.8)

Source(s): SolarAPP+ for Solar Installers

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas & Electric (PG&E)

Fairfield is a well-documented Solano County city within PG&E's core Northern California service territory.

Sources & confidence

Confidence: High (0.9)

Source(s): SolarAPP+ for Solar Installers

Generation supplier

MCE (Marin Clean Energy) (Community Choice Aggregator)

MCE's own service-area page confirms Fairfield as one of 4 Solano County communities it serves (alongside Benicia, Vallejo, and unincorporated Solano County). PG&E continues to deliver the power and provide billing/customer service.

Sources & confidence

Confidence: High (0.85)

Source(s): Service Area

Interconnection

https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html

PG&E's own utility-wide Net Energy Metering (NEM) program page.

Confidence: Medium (0.55)

Permit authority

City of Fairfield Building Safety Division

Sources & confidence

Confidence: High (0.9)

Source(s): SolarAPP+ for Solar Installers

Permit page: https://www.fairfield.ca.gov/government/city-departments/community-development/building-safety/solar-app

Inspection steps

  • Log in to BUILD and proceed through the SolarAPP+ permit application process
  • Upload all documents received from SolarAPP+, as well as plans, to BUILD after applying
  • Email building@fairfield.ca.gov with the permit number to confirm the SolarApp+ documents have been uploaded
  • Schedule the inspection in BUILD
Sources & confidence

Confidence: High (0.85)

Source(s): SolarAPP+ for Solar Installers

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SolarAPP+ (residential roof-mounted, retrofit systems) via eTRAKiT
  • Other conditions:
    • Commercial, multi-family, ground-mount, or addition-to-existing-system projects must be submitted directly to Building Safety by email
    • Applicants must submit for and receive building permit approval prior to installation
Sources & confidence

Confidence: Medium (0.7)

Source(s): SolarAPP+ for Solar Installers

Official contacts

Official contacts

Confidence: Medium (0.7)

Need a solar installer who handles permits in Fairfield?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Fairfield, California?

Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Fairfield. The default electricity generation supplier is MCE (Marin Clean Energy), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).

How long does a residential solar permit take in Fairfield?

The City's own page states 'A permit application that previously took days or weeks for review can now be approved instantly and issued the next business day,' and separately that eligible projects use 'the automated SolarAPP+ portal for instant permitting.'

What documents are required for a solar permit in Fairfield?

Commonly required documents include: Active City of Fairfield business license; SolarAPP+ approval documents; Plans (uploaded to BUILD along with SolarAPP+ documents); Master solar permit number (subdivision roof-mount projects only).

Who do I contact about solar permits in Fairfield?

City of Fairfield Building Safety Division, phone 707-428-7451, email building@fairfield.ca.gov.