California / Local permit guide
Long Beach Solar Permit Guide
Your local requirements. The official sources. A clearer next step.
- Permit authority
- City of Long Beach Community Development Department, Building and Safety BureauSource linked
- Electric utility
- Southern California Edison (SCE)Source linked
- Local pathway
- Express rooftop solar PV permitting (IB-023)Project-specific eligibility conditions apply.
- Review time
- Not yet verified.
Los Angeles · Explore related utility guides
Jump to a section
Planning a new solar project? See the homeowner quote option →
Research coverage
Your permit path,
at a glance.
This shows what GridPermit has verified for Long Beach. It does not show the status of a specific project.
- 01Permit authorityCity of Long Beach Community Development Department, Building and Safety BureauAuthority sourced
- 02DocumentsChecklist includes conditional itemsConditions apply
- 03InspectionInspection guidance for Long BeachSteps sourced
- 04Utility & PTOSouthern California Edison (SCE)Utility path sourced
Paid referral disclosure: GridPermit has a paid referral relationship with CompareSolarPrices. If you use this link and later complete a qualifying action, GridPermit may receive compensation.
Want a solar quote after reviewing the permit requirements in Long Beach?
Continue to CompareSolarPrices to request a homeowner solar quote for Long Beach.
Have a recent electricity bill ready. CompareSolarPrices will ask you to confirm your contact details and receipt of its quote. Submit those details only on its website, not to GridPermit.
You will continue on CompareSolarPrices' website. GridPermit is not the installer.
01 / Know your path
Two approvals.
One project.
Permit & inspection
City of Long Beach Community Development Department, Building and Safety Bureau
Local requirementsA local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.
How to read this guide
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Sources & confidence
02 / Prepare your application
What you need.
Sources & confidence
Permit fees
The City states that revised Community Development fees took effect October 1, 2026. The prior residential rooftop photovoltaic amounts were therefore removed from the current guide until the applicable FY 2027 solar fee can be independently verified from the current City schedule.
Not yet verified.
Rebates on record
Rebates on record
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
IB-023 identifies SCE as the city's electric utility and requires separate SCE interconnection approval.
Sources & confidence
Generation supplier
Southern California Edison (SCE) (utility)
The City’s current Community Solar page identifies Southern California Edison as the electricity utility carrying out the program. Clean Power Alliance’s current 38-community service map does not list Long Beach, so no CPA generation service is inferred for this record.
Sources & confidence
Interconnection
SCE's FAQ links its online interconnection system; utility approval is separate from city permitting.
Inspection steps
- After permit issuance and installation, schedule city inspection.
- Keep approved plans, permit and job card on site, with access to all equipment and compliant ladders.
- Obtain final inspection approval; SCE interconnection approval is separately required before operation.
Complex projects may require multiple inspections.
Sources & confidence
Eligibility constraints
- Property types: single-family, two-family, multifamily
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Express rooftop solar PV permitting (IB-023)
- Other conditions:
- Flush-mounted rooftop PV up to 38.4 kW; the bulletin does not specify AC versus DC.
- All express-checklist answers must qualify; otherwise regular review applies.
- Multifamily buildings require fire review.
Sources & confidence
Official contacts
Official contacts
- City solar permitting, phone: 562-570-7648, official website
Official sources
Official sources
- Outage Reliability Reports — Los Angeles County, Southern California Edison (utility). Accessed 2026-09-30.
- FAQs about the Solar Billing Plan, Southern California Edison (utility). Accessed 2026-09-30.
- Self-Generation Incentive Program — current budget notice, Southern California Edison (utility). Accessed 2026-09-30.
- Solar Photovoltaic (PV) Process, City of Long Beach (government). Accessed 2026-09-30.
- IB-023 — Express Permit of Rooftop Solar PV System, City of Long Beach (government). Accessed 2026-09-30.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- Community Solar, City of Long Beach (government). Accessed 2026-10-08.
- Clean Power Alliance 2025 Impact Report — 38 Served Communities, Clean Power Alliance (other_official). Accessed 2026-10-08.
Frequently Asked Questions
What utility serves solar customers in Long Beach, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Long Beach. The same utility is also listed as the default electricity generation supplier.
What documents are required for a solar permit in Long Beach?
Commonly required documents include: Community Development permit application; Planning permit / Certificate of Appropriateness; Completed residential express checklist (FORM-016); Electrical plans, single-line diagram, equipment sheets and site diagram; Roof plan with panel layout, access pathways, fire classification and markings.
Who do I contact about solar permits in Long Beach?
City solar permitting, phone 562-570-7648.
Related cities
Related cities
Other verified cities related to Long Beach. See all cities on the California solar permit guide index.
- Lancaster, Southern California Edison (SCE)
- Palmdale, Southern California Edison (SCE)
- Santa Clarita, Southern California Edison (SCE)
- Alhambra, Southern California Edison (SCE)
- Aliso Viejo, Southern California Edison (SCE)
- Apple Valley, Southern California Edison (SCE)