GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Not yet verified.
LADBS's own Express Permit process is described as requiring no plan check for eligible systems, issued online — consistent with a fast/expedited process, but no source found stated a specific same-day or numeric business-day timeline for either the LADBS permit or the LADWP interconnection/NEM approval step, so no day range is recorded.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Los Angeles Department of Water and Power (LADWP)
Generation supplier
Los Angeles Department of Water and Power (LADWP) (utility)
LADWP is a vertically-integrated municipal utility (like Pasadena Water and Power) — it generates and delivers its own power rather than sitting alongside a separate CCA. No Community Choice Aggregator was found serving the City of Los Angeles in the sources reviewed this session.
Interconnection
ladwp.com returned HTTP 403 to direct automated fetch; confirmed via consistent search-engine indexing describing LADWP's NEM interconnection application process (obtaining an Interconnection Work Request Number via ladwp.com/nem).
Required documents
- LADBS Express Permit application (submitted online only) (required when: systems 10 kW or less in a one- or two-family dwelling, meeting the Express Permit checklist)
- LADWP Interconnection Work Request Number (WR#) (required when: always, for grid interconnection/net energy metering)
Inspection steps
Not yet verified.
Eligibility constraints
- Property types: one-family dwelling, two-family dwelling
- Max system size (AC): 10 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: LADBS Express Permit (no plan check required)
- Other conditions:
- LADWP's own NEM program offers a 'Fast Track Process' for systems under 10 kW, skipping the performance meter test
- No individual LADWP customer can apply for net metering with a system larger than 1 megawatt (MW)
- Express Permits are issued online only via dbs.lacity.gov
Official contacts
- LADBS Express Permit support, email: epermit.ladbs@lacity.org, official website
- LADWP Solar Customer Service, phone: 1-866-484-0433, official website
Paid referral disclosure: GridPermit has a paid referral relationship with CompareSolarPrices. If you use this link and later complete a qualifying action, GridPermit may receive compensation.
Want a solar quote after reviewing the permit requirements in Los Angeles?
Continue to CompareSolarPrices to request a homeowner solar quote for Los Angeles.
You will continue on CompareSolarPrices' website. GridPermit is not the installer.
Sources
- Express Permits (No Plan Check Required), Los Angeles Department of Building and Safety (LADBS) (government). Accessed 2026-08-02.
- Who We Are, Los Angeles Department of Water and Power (LADWP) (government). Accessed 2026-08-02.
- Self-Generation Incentive Program, Los Angeles Department of Water and Power (LADWP) (government). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Los Angeles, California?
Los Angeles Department of Water and Power (LADWP) is the interconnection and distribution utility for Los Angeles. The default electricity generation supplier is Los Angeles Department of Water and Power (LADWP), a utility, separate from Los Angeles Department of Water and Power (LADWP).
How long does a residential solar permit take in Los Angeles?
LADBS's own Express Permit process is described as requiring no plan check for eligible systems, issued online — consistent with a fast/expedited process, but no source found stated a specific same-day or numeric business-day timeline for either the LADBS permit or the LADWP interconnection/NEM approval step, so no day range is recorded.
What documents are required for a solar permit in Los Angeles?
Commonly required documents include: LADBS Express Permit application (submitted online only); LADWP Interconnection Work Request Number (WR#).
Who do I contact about solar permits in Los Angeles?
LADBS Express Permit support, email epermit.ladbs@lacity.org.
Related California cities
Other verified cities related to Los Angeles. See all cities on the California solar permit guide index.
- Alhambra, Southern California Edison (SCE)
- Arcadia, Southern California Edison (SCE)
- Azusa, Azusa Light & Water
- Baldwin Park, Southern California Edison (SCE)
- Beverly Hills, Southern California Edison (SCE)
- Burbank, Burbank Water and Power (BWP)