Malibu Solar Permit Guide
Southern California Edison (SCE) territory · Los Angeles County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
Generation supplier
Clean Power Alliance (CPA) - 100% Green Power (default) (Community Choice Aggregator)
Confirmed via a directly-fetched California Community Choice Association (CalCCA) press release: Malibu is explicitly named among the communities on 100% Green Power as their default CPA energy option. Customers may choose another CPA option or opt out at any time.
Interconnection
SCE's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other SCE-territory records this session.
Required documents
- Licensed contractor license (A, B, C-10, or C-46) or owner/builder application (required when: always)
- Issued permit and inspection checklist (printed, needed at inspection) (required when: always)
Inspection steps
- Request inspection through the Development Portal when ready
- Print the issued permit and inspection checklist, required to be available at the inspection
Eligibility constraints
- Property types: residential, duplex
- Max system size (AC): 38.4 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Symbium automated instant permitting (residential, up to 38.4 kW AC) / standard electronic Development Portal submission (ineligible or larger projects)
- Other conditions:
- Limited to single-family residential units (including duplexes) and accessory dwelling units (ADUs)
- Applicants ineligible for instant review, or seeking rooftop/energy storage systems outside Symbium's parameters, can still submit electronically through the Development Portal
Official contacts
- City of Malibu Building Safety Division, phone: 310-456-2489 ext. 263, email: JBauer@malibucity.org, official website
- City of Malibu Building Safety Division (general), phone: 310-456-2489, email: mbuilding@malibucity.org, official website
- SGIP Program Administrator (SCE territory), email: SGIPGroup@sce.com, official website
Need a solar installer who handles permits in Malibu?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Eight more Clean Power Alliance Communities Choose 100% Green Power as their primary energy option, California Community Choice Association (CalCCA) (other_official). Accessed 2026-08-06.
- Incorporated Cities and Counties Served by SCE, Southern California Edison (utility). Accessed 2026-08-06.
- Residential Solar Permits, City of Malibu (government). Accessed 2026-08-06.
- Net Energy Metering (NEM) Time of Use, Southern California Edison (utility). Accessed 2026-08-03.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Malibu, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Malibu. The default electricity generation supplier is Clean Power Alliance (CPA) - 100% Green Power (default), a Community Choice Aggregator (CCA), separate from Southern California Edison (SCE).
What documents are required for a solar permit in Malibu?
Commonly required documents include: Licensed contractor license (A, B, C-10, or C-46) or owner/builder application; Issued permit and inspection checklist (printed, needed at inspection).
Who do I contact about solar permits in Malibu?
City of Malibu Building Safety Division, phone 310-456-2489 ext. 263, email JBauer@malibucity.org.
Related California cities
Other verified cities related to Malibu. See all cities on the California solar permit guide index.
- Alhambra, Southern California Edison (SCE)
- Arcadia, Southern California Edison (SCE)
- Azusa, Azusa Light & Water
- Baldwin Park, Southern California Edison (SCE)
- Beverly Hills, Southern California Edison (SCE)
- Burbank, Burbank Water and Power (BWP)