California / Local permit guide

Manhattan Beach Solar Permit Guide

Your local requirements. The official sources. A clearer next step.

Electric utility
Southern California Edison (SCE)Source linked
Local pathway
Small Residential Rooftop Solar Energy System Permit Expediting (MBMC Chapter 9.06)Project-specific eligibility conditions apply.
Review time
0–3 daysSee source scope and conditions below.
See your permit path

Los Angeles County · Explore related utility guides

Source healthLast verified 2026-08-1110 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Manhattan Beach Building and Safety Division and SCE before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Manhattan Beach. It does not show the status of a specific project.

  1. 01Permit authorityCity of Manhattan Beach Building and Safety DivisionAuthority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for Manhattan BeachSteps sourced
  4. 04Utility & PTOSouthern California Edison (SCE)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Manhattan Beach Building and Safety Division

Local requirements
Electric utility

Interconnection & PTO

Southern California Edison (SCE)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

0–3 days

Manhattan Beach Municipal Code Section 9.06.050(A): 'The permit shall be issued the same day for over-the-counter applications or within three (3) business days for electronic application,' unless the Building Official requires a Solar Use Permit due to a specific, adverse health/safety impact.

Sources & confidence

Confidence: High (0.85)

Source(s): Chapter 9.06 - Solar Energy System Permit Expediting (Manhattan Beach Municipal Code)

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 2 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: Medium (0.75)

Source(s): Chapter 9.06 - Solar Energy System Permit Expediting (Manhattan Beach Municipal Code)

Permit fees

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Southern California Edison (SCE)

SCE's own 'Incorporated Cities and Counties Served by SCE' fact sheet (updated 3/17/2025) explicitly lists 'Manhattan Beach' by name among the cities in its service area.

Sources & confidence

Confidence: High (0.9)

Source(s): Incorporated Cities and Counties Served by SCE

Generation supplier

Clean Power Alliance (CPA) - 100% Green Power (default) (Community Choice Aggregator)

Confirmed via a directly-fetched California Community Choice Association (CalCCA) press release: Manhattan Beach is explicitly named among the communities that transitioned to 100% Green Power as their default CPA energy option beginning October 2022. Customers may choose another CPA option or opt out at any time. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.85)

Source(s): Eight more Clean Power Alliance Communities Choose 100% Green Power as their primary energy option

Interconnection

https://www.sce.com/clean-energy-efficiency/solar-generating-your-own-power/billing-incentives/net-energy-metering

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.6)

Permit authority

City of Manhattan Beach Building and Safety Division

The page's own 'PV Solar Panel Plan Guidelines' PDF (linked from the Forms and Handouts subpage) triggers a file-download dialog rather than a viewable page and could not be read. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (0.85)

Source(s): Building and Safety

Permit page: https://www.manhattanbeach.gov/departments/community-development/building-and-safety

Inspection steps

  • Request inspections through the Citizen Self Service (CSS) Portal no later than 3:00pm the business day before the requested date; the inspector is scheduled for the following business day
  • Requests made after 3:00pm, or on a weekend/holiday, are pushed to the next business day
  • Only an active contact listed on the permit may request inspections, and a maximum of 3 inspections per project may be requested per day

This is the City's general Building & Safety inspection-scheduling process (the same page covers all building permit types, including solar); the City does not publish a separate, solar-specific inspection sequence.

Sources & confidence

Confidence: High (0.8)

Source(s): Building and Safety

Eligibility constraints

  • Property types: residential, duplex
  • Max system size (AC): 10 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: 30 kW
  • Program/pathway: Small Residential Rooftop Solar Energy System Permit Expediting (MBMC Chapter 9.06)
  • Other conditions:
    • System must be installed on a single- or duplex-family dwelling
    • Solar panel/module array must not exceed the maximum legal building height per MBMC Title 10, Chapter 10.60
    • Only one consolidated inspection is required for eligible systems
    • The City cannot condition approval of an application on approval of an association (HOA)
Sources & confidence

Confidence: High (0.85)

Source(s): Chapter 9.06 - Solar Energy System Permit Expediting (Manhattan Beach Municipal Code)

Official contacts

Official contacts

Confidence: Medium (0.6)

Need a solar installer who handles permits in Manhattan Beach?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Manhattan Beach, California?

Southern California Edison (SCE) is the interconnection and distribution utility for Manhattan Beach. The default electricity generation supplier is Clean Power Alliance (CPA) - 100% Green Power (default), a Community Choice Aggregator (CCA), separate from Southern California Edison (SCE).

How long does a residential solar permit take in Manhattan Beach?

Manhattan Beach Municipal Code Section 9.06.050(A): 'The permit shall be issued the same day for over-the-counter applications or within three (3) business days for electronic application,' unless the Building Official requires a Solar Use Permit due to a specific, adverse health/safety impact.

What documents are required for a solar permit in Manhattan Beach?

Commonly required documents include: Standard Plan (per the California Solar Permitting Guidebook); Expedited-review Checklist (per the California Solar Permitting Guidebook).

Who do I contact about solar permits in Manhattan Beach?

SGIP Program Administrator (SCE territory), email SGIPGroup@sce.com.