California / Local permit guide
Monrovia Solar Permit Guide
Your local requirements. The official sources. A clearer next step.
- Permit authority
- City of Monrovia Building DivisionSource linked
- Electric utility
- Southern California Edison (SCE)Source linked
- Local pathway
- SolarAPP+ automated permittingProject-specific eligibility conditions apply.
- Review time
- Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
Los Angeles County · Explore related utility guides
Jump to a section
Planning a new solar project? See the homeowner quote option →
Research coverage
Your permit path,
at a glance.
This shows what GridPermit has verified for Monrovia. It does not show the status of a specific project.
01 / Know your path
Two approvals.
One project.
A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.
How to read this guide
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Same-day review for eligible expedited-permit projects
No verified standard-path permit timeline is available.
The City's own page states 'Only projects that conform to this list are eligible to use the automated SolarAPP+ portal for instant permitting,' and that once fees are paid, City Permit Technicians automatically receive the approved documents and create the City permit.
Sources & confidence
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Sources & confidence
02 / Prepare your application
What you need.
Sources & confidence
Permit fees
Not yet verified.
Rebates on record
Rebates on record
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
SCE's own 'Incorporated Cities and Counties Served by SCE' fact sheet (updated 3/17/2025) explicitly lists 'Monrovia' by name among the cities in its service area.
Sources & confidence
Generation supplier
Clean Power Alliance (CPA) (Community Choice Aggregator)
Confirmed via a directly-fetched California Community Choice Association (CalCCA) press release: the CPA Board of Directors approved Monrovia as a new member community on December 1, 2022, with service expected to begin in 2024. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Sources & confidence
Interconnection
Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.
Inspection steps
- Call (626) 932-5581 to schedule an inspection once ready; requests must be made by 3:00 pm prior to the requested day
- Have the approved documents and issued permit available at the project site when the inspector arrives
Sources & confidence
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ automated permitting
- Other conditions:
- Not usable for ground-mounted, new construction, or non-residential (multi-family, commercial, community, utility-scale) projects
- Ineligible projects may apply through the standard review process by contacting the Building Division at (626) 932-5581
Sources & confidence
Official contacts
Official contacts
- City of Monrovia Building Division, phone: 626-932-5581, official website
- SGIP Program Administrator (SCE territory), email: SGIPGroup@sce.com, official website
Need a solar installer who handles permits in Monrovia?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.
Official sources
Official sources
- Clean Power Alliance Board of Directors Approves Adding the Cities of Hermosa Beach, Monrovia, and Santa Paula as New Member Communities, California Community Choice Association (CalCCA) (other_official). Accessed 2026-08-06.
- SolarAPP+, City of Monrovia (government). Accessed 2026-08-06.
- Incorporated Cities and Counties Served by SCE, Southern California Edison (utility). Accessed 2026-08-06.
- Net Energy Metering (NEM) Time of Use, Southern California Edison (utility). Accessed 2026-08-03.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Monrovia, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Monrovia. The default electricity generation supplier is Clean Power Alliance (CPA), a Community Choice Aggregator (CCA), separate from Southern California Edison (SCE).
How long does an expedited-eligible residential solar permit take in Monrovia?
The City's own page states 'Only projects that conform to this list are eligible to use the automated SolarAPP+ portal for instant permitting,' and that once fees are paid, City Permit Technicians automatically receive the approved documents and create the City permit. No verified standard-path permit timeline is available.
What documents are required for a solar permit in Monrovia?
Commonly required documents include: SolarAPP+ Approval Documents (includes Permit and Inspection Checklist).
Who do I contact about solar permits in Monrovia?
City of Monrovia Building Division, phone 626-932-5581.
Related cities
Related cities
Other verified cities related to Monrovia. See all cities on the California solar permit guide index.
- Alhambra, Southern California Edison (SCE)
- Arcadia, Southern California Edison (SCE)
- Azusa, Azusa Light & Water
- Baldwin Park, Southern California Edison (SCE)
- Beverly Hills, Southern California Edison (SCE)
- Burbank, Burbank Water and Power (BWP)