Ross Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Marin County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
1–3 days
Permit applications are reviewed within 1-3 business days for electronic applications from the date of receipt of a complete application, per the town's expedited-review procedures.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
MCE (Marin Clean Energy) (Community Choice Aggregator)
MCE's own service-area page confirms Ross as one of Marin County's member communities. PG&E continues to deliver the power and provide billing/customer service.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
Not yet verified.
Inspection steps
- Telephone the Building Department at (415) 453-1453 ext. 117 to schedule an inspection
- Inspections are conducted with current health and safety protocols in place
This is the Town's general Building Department inspection scheduling process (the same page covers all building permit types, including solar); the Town's page does not describe a separate, solar-specific inspection sequence.
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Expedited Review of Small Residential Rooftop Solar Energy System Permits (municipal code Ch. 15.46)
Official contacts
- Town of Ross Permit Technician, phone: 415-453-1453, email: breher@townofrossca.gov, official website
Need a solar installer who handles permits in Ross?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- California Solar Permitting Guidebook, Town of Ross (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- Service Area, MCE (Marin Clean Energy) (other_official). Accessed 2026-08-08.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- Building, Town of Ross (government). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Ross, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Ross. The default electricity generation supplier is MCE (Marin Clean Energy), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
How long does a residential solar permit take in Ross?
Permit applications are reviewed within 1-3 business days for electronic applications from the date of receipt of a complete application, per the town's expedited-review procedures.
Who do I contact about solar permits in Ross?
Town of Ross Permit Technician, phone 415-453-1453, email breher@townofrossca.gov.
Related California cities
Other verified cities related to Ross. See all cities on the California solar permit guide index.
- Corte Madera, Pacific Gas & Electric (PG&E)
- Fairfax, Pacific Gas & Electric (PG&E)
- Larkspur, Pacific Gas & Electric (PG&E)
- Mill Valley, Pacific Gas & Electric (PG&E)
- Novato, Pacific Gas & Electric (PG&E)
- San Anselmo, Pacific Gas & Electric (PG&E)