Electric utility
Pacific Gas and Electric Company (PG&E)Source linked
See your permit path

Santa Clara County · Explore related utility guides

Source healthLast verified 2026-08-1114 official sources5 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of San José Development Services Permit Center (jointly operated by the Building, Planning, Fire, and Public Works divisions) and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for San José. It does not show the status of a specific project.

  1. 01Permit authorityCity of San José Development Services Permit Center (jointly operated by the Building, Planning, Fire, and Public Works divisions)Authority sourced
  2. 02DocumentsChecklist includes conditional itemsConditions apply
  3. 03InspectionInspection guidance for San JoséSteps sourced
  4. 04Utility & PTOPacific Gas and Electric Company (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of San José Development Services Permit Center (jointly operated by the Building, Planning, Fire, and Public Works divisions)

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas and Electric Company (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): Self-Generation Incentive Program (SGIP), SGIP — Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

0 of 6 markedSaved only on this device; not confirmation of permit readiness.

Sources & confidence

Confidence: High (0.85)

Source(s): Solar & Storage Battery Projects

Permit fees

Checked on the City's own pages 2026-10-24. No flat solar permit fee is published; the City says SJPermits.org presents the fee at application. PG&E interconnection fees are separate and not recorded here.

  • City permit issuance fee (online permits): amount not verified ($211 per hour of processing time, or the scheduled amount if greater; minimum for permits issued through the Online Permits service is 50% of the specified processing fee)

    FY 2026-27 Building Division Fee Schedule, effective August 10, 2026. The schedule has no solar-specific issuance amount for single-family homes; SJPermits.org shows the actual fee when you apply.

  • City electrical permit (inspection) fee: amount not verified (greater of $315 per hour of required inspection time or the itemized amount; Photovoltaic System (Single Family) is listed with a 60-minute minimum and 50 minutes per unit)

    Charged in addition to the permit issuance fee, per the fee schedule. A separate structural building permit fee for PV is not itemized in the residential tables and was not determined.

  • City plan review (Standard Plan Review only): amount not verified ($325 per hour or the scheduled amount if greater)

    Applies to projects that do not qualify for the online SJPermits path. Credit card payments carry a 2.66% third-party fee.

Sources & confidence

Confidence: Medium (0.7)

Source(s): Building and Structure Permits Fee Schedule, FY 2026-27 (effective August 10, 2026), Building Permit Fees, Solar & Storage Battery Projects, Building Online Permits at SJPermits.org

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas and Electric Company (PG&E)

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Sources & confidence

Confidence: High (1)

Source(s): SGIP — Contact

Generation supplier

San José Clean Energy (SJCE) - GreenSource (default, ~62% renewable) (Community Choice Aggregator)

San Jose Clean Energy's own Terms and Conditions page states: 'San José Clean Energy is the default electric generation service provider in the City of San José,' with GreenSource as the default product. The same page confirms PG&E remains delivery/billing: 'You will receive a single monthly bill from PG&E that includes all electricity related charges, including SJCE electric generation charges,' and 'PG&E will continue to charge for transmission, distribution, public goods programs and other non-generation charges.'

Sources & confidence

Confidence: High (0.9)

Source(s): GreenSource Terms and Conditions

Interconnection

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.6)

Permit authority

City of San José Development Services Permit Center (jointly operated by the Building, Planning, Fire, and Public Works divisions)

Confirmed via direct retrieval of the Permit Center page; the page describes a multi-department partnership rather than a single named department.

Sources & confidence

Confidence: High (0.8)

Source(s): Development Services Permit Center

Permit page: https://www.sanjoseca.gov/businesses/development-services-permit-center/start-your-project/single-family-duplex-properties/solar-storage-battery-projects

Inspection steps

  • The issued Permit Card lists required inspections; schedule via SJPermits.org or call 408-535-3555
  • The Permit Card must be onsite and available to the inspector at all times
  • Have plans and manufacturer instructions available, and ensure access to all areas of the project work (provide a ladder if needed)
  • The City inspector reviews the electrical plan at the project site on the day of inspection, verifying UL-listed/labeled equipment, minimum working space, conductor sizing, and voltage calculations

Per the City's own 'Solar & Storage Battery Projects' page's Inspections and 'Requirements for Solar/Battery Installations' sections.

Sources & confidence

Confidence: High (0.8)

Source(s): Solar & Storage Battery Projects

Eligibility constraints

  • Property types: residential
  • Max system size (AC): Not yet verified.
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: Not yet verified.
  • Program/pathway: SJPermits.org online fast-path (qualifying projects) or Standard Plan Review Service (nonqualifying projects)
  • Other conditions:
    • To qualify for the SJPermits online fast path: rooftop installation on a single-family, duplex, or townhouse property; total panel weight (incl. frame) under 5 lbs/sq.ft.; max concentrated load under 40 lbs per support point; max height above roof surface 18 inches; panels not ballasted
    • Calculated PV system voltage must not exceed 600 volts
    • Battery installations require a City-approved anchorage detail or Master file, with bracket-anchorage inspection typically required before the battery is installed
Sources & confidence

Confidence: High (0.85)

Source(s): Solar & Storage Battery Projects

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in San José?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in San José, California?

Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for San José. The default electricity generation supplier is San José Clean Energy (SJCE) - GreenSource (default, ~62% renewable), a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).

What documents are required for a solar permit in San José?

Commonly required documents include: Building Permit Application; Smoke and Carbon Monoxide Alarm Requirements form; Site Plan (building footprint, PV panel/battery locations, utility interconnection point); Building Plans (framing/anchorage details, structural calculations for vertical/lateral loads); Electrical Plans (system configuration, conduit/disconnect/overcurrent details, short circuit current and open circuit voltage); Owner-Builder Acknowledgement and Verification of Information Form.

Who do I contact about solar permits in San José?

San José Development Services Permit Center, phone 408-535-3555.