California / Local permit guide
Los Gatos Solar Permit Guide
Your local requirements. The official sources. A clearer next step.
- Permit authority
- Town of Los Gatos Building DivisionSource linked
- Electric utility
- Pacific Gas & Electric (PG&E)Source linked
- Local pathway
- SolarApp+ (automated code-compliance review for most residential rooftop PV)Project-specific eligibility conditions apply.
- Review time
- Same-day review for eligible expedited-permit projectsNo verified standard-path permit timeline is available.See source scope and conditions below.
Santa Clara County · Explore related utility guides
Jump to a section
Planning a new solar project? See the homeowner quote option →
Research coverage
Your permit path,
at a glance.
This shows what GridPermit has verified for Los Gatos. It does not show the status of a specific project.
01 / Know your path
Two approvals.
One project.
Permit & inspection
Town of Los Gatos Building Division
Local requirements- SolarAPP+ Eligibility: Battery, MPU, Existing PV & Ground MountRelevant to the permit pathway listed in this guide
Interconnection & PTO
Pacific Gas & Electric (PG&E)
Utility requirements- PG&E Zero-Export Solar + Battery: Which Interconnection Path?About PG&E interconnection and permission to operate
- PG&E Solar Installed but No PTO: What to CheckAbout PG&E interconnection and permission to operate
A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.
How to read this guide
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Same-day review for eligible expedited-permit projects
No verified standard-path permit timeline is available.
The Town's own SolarAPP+ page explicitly describes 'automated review and instant building permit issuance for licensed contractors,' with Step 3 titled 'Apply for an Instant Building Permit' and Step 8 'Your Permit is Issued' immediately following application review.
Sources & confidence
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Sources & confidence
02 / Prepare your application
What you need.
Sources & confidence
Permit fees
Not yet verified.
Rebates on record
Rebates on record
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Los Gatos is a well-documented Santa Clara County city within PG&E's core Northern California service territory.
Sources & confidence
Generation supplier
Silicon Valley Clean Energy (SVCE) (Community Choice Aggregator)
SVCE's own 'The Agency' page confirms Los Gatos as one of 13 member jurisdictions. PG&E continues to deliver the power and provide billing/customer service.
Sources & confidence
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Inspection steps
Not yet verified.
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarApp+ (automated code-compliance review for most residential rooftop PV)
- Other conditions:
- Applicants must register for an account on the Town's permit portal; a Building Permit Technician must approve the account before submission can proceed
Sources & confidence
Official contacts
Official contacts
- Town of Los Gatos Building Division, email: Building@losgatosca.gov, official website
Need a solar installer who handles permits in Los Gatos?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.
Official sources
Official sources
- Apply Directly for a Residential SolarAPP+ Permit, Town of Los Gatos (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- The Agency, Silicon Valley Clean Energy (other_official). Accessed 2026-08-08.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Los Gatos, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Los Gatos. The default electricity generation supplier is Silicon Valley Clean Energy (SVCE), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
How long does an expedited-eligible residential solar permit take in Los Gatos?
The Town's own SolarAPP+ page explicitly describes 'automated review and instant building permit issuance for licensed contractors,' with Step 3 titled 'Apply for an Instant Building Permit' and Step 8 'Your Permit is Issued' immediately following application review. No verified standard-path permit timeline is available.
What documents are required for a solar permit in Los Gatos?
Commonly required documents include: Completed permit application; Plan set (bookmarked, signed by design professional, single PDF); SolarApp+ Approval Number.
Who do I contact about solar permits in Los Gatos?
Town of Los Gatos Building Division, email Building@losgatosca.gov.
Related cities
Related cities
Other verified cities related to Los Gatos. See all cities on the California solar permit guide index.
- Campbell, Pacific Gas & Electric (PG&E)
- Cupertino, Pacific Gas & Electric (PG&E)
- Gilroy, Pacific Gas & Electric (PG&E)
- Milpitas, Pacific Gas and Electric Company (PG&E)
- Monte Sereno, Pacific Gas & Electric (PG&E)
- Morgan Hill, Pacific Gas & Electric (PG&E)