Willits Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Mendocino County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
Sonoma Clean Power (SCP) (Community Choice Aggregator)
Directly re-verified this session via Sonoma Clean Power's own 'Who We Are' page, which explicitly states: 'Here in Sonoma and Mendocino Counties, our local CCA is Sonoma Clean Power (SCP)' and 'SCP replaced PG&E's power sources for electric customers in Sonoma and Mendocino County' -- a whole-county coverage statement, not a partial/unincorporated-only claim. Willits, a Mendocino County city, is therefore served by SCP. PG&E continues to deliver the power and provide billing/customer service.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- Standardized residential rooftop PV submittal (Residential Rooftop Photovoltaic Guide) (required when: always)
Inspection steps
- Inspections conducted Mondays-Thursdays 10am-4pm; requests must be made at least 24 hours in advance by counter, phone, or email
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Standardized permit submittal for residential (one- and two-family dwellings and legally permitted accessory buildings) roof-mounted PV systems
- Other conditions:
- Additional requirements apply if the project is in a historical district, subject to a homeowner's association, or is a ground-mount system
Official contacts
- City of Willits Building Department, phone: 707-459-7112, email: aojeda@cityofwillits.org, official website
Need a solar installer who handles permits in Willits?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Building & Safety, City of Willits (government). Accessed 2026-08-09.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-09.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- Who We Are, Sonoma Clean Power (other_official). Accessed 2026-08-10.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Willits, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Willits. The default electricity generation supplier is Sonoma Clean Power (SCP), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
What documents are required for a solar permit in Willits?
Commonly required documents include: Standardized residential rooftop PV submittal (Residential Rooftop Photovoltaic Guide).
Who do I contact about solar permits in Willits?
City of Willits Building Department, phone 707-459-7112, email aojeda@cityofwillits.org.
Related California cities
Other verified cities related to Willits. See all cities on the California solar permit guide index.
- Albany, Pacific Gas & Electric (PG&E)
- American Canyon, Pacific Gas & Electric (PG&E)
- Antioch, Pacific Gas & Electric (PG&E)
- Arroyo Grande, Pacific Gas & Electric (PG&E)
- Arvin, Pacific Gas & Electric (PG&E)
- Atascadero, Pacific Gas & Electric (PG&E)