Independent Educational Guide: Hawaii residential solar permit facts, sourced, dated, and confidence-scored. Not legal, engineering, or permit advice.

Honolulu Solar Permit Guide

Hawaiian Electric Company (HECO) territory · City and County of Honolulu

✓ Last verified 2026-08-134 official sources
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City and County of Honolulu, Department of Planning and Permitting (DPP) and HECO before making a decision.

Overview

GridPermit collects Hawaii residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Battery/solar incentive program on record

Bring Your Own Device Plus (BYOD Plus)

Incentive program for customers who install a new battery and agree to dispatch it during specified time periods, replacing the previous 'Battery Bonus' program.

Status on file: active. Verify current status before relying on this.

Confidence: Medium (0.75)

Source(s): Smart Renewable Energy Programs

Permit fees

Not yet verified.

Rebates

Renewable Energy Technologies Income Tax Credit (RETITC) — Solar Energy System

Statewide Hawaii state income tax credit for solar energy systems (HRS 235-12.5): 35% of actual installed cost, capped at $5,000 per system for single-family residential property (lower of the two), $350 per unit for multi-family residential, or $500,000 per system for commercial property. A separate, higher-value $2,250 cap applies if the system's primary purpose is solar water heating rather than PV. Any utility rebate received must be deducted from system cost before computing the credit. Applies statewide to any Hawaii taxpayer regardless of county/island — a genuine reusable statewide fact, not utility- or county-specific.

Status on file: active. Verify current status before relying on this.

Confidence: High (0.9)

Source(s): HRS §235-12.5 — Renewable energy technologies; income tax credit

Utility and generation supplier

Utility

Hawaiian Electric Company (HECO)

Confidence: High (0.9)

Source(s): Smart Renewable Energy Programs

Generation supplier

Hawaiian Electric Company (HECO) (utility)

Per Hawaiian Electric's own 'Smart Renewable Energy Programs' page: as of the program's rollout (beginning ~April 2024), most new residential rooftop solar customers choose between 'Smart Renewable Energy (SRE) Export' (export bill credits, no project size limit) and 'SRE Non-Export' (no export credits, no size limit); a 'Bring Your Own Device Plus (BYOD Plus)' incentive is available for battery installations dispatched during specified periods. Legacy 'Net Energy Metering (NEM)' and 'NEM Plus' customers are NOT required to transition and may instead enroll additional capacity under 'NEM Plus' or 'NEM Plus Limited Export.' Older programs (Customer Grid-Supply, Customer Grid-Supply Plus, Smart Export, Standard Interconnection Agreement, Customer Self-Supply) are closed to new customers and are being transitioned into the SRE framework over time (transitions after 7 years in-program began Oct. 1, 2024). All Smart Renewable Energy participants must have an advanced (smart) meter.

Confidence: High (0.85)

Source(s): Smart Renewable Energy Programs

Permit authority

City and County of Honolulu, Department of Planning and Permitting (DPP)

Confidence: High (0.9)

Source(s): Solar Permit, Clean Energy (Expedited Building Permit Application)

Permit page: https://www.honolulu.gov/dpp/solar-permit/

Required documents

  • Manufacturer Specification Sheet (required when: when an MM# (pre-approved module/inverter combination number) is not provided)
  • Installation and Operations Manual (required when: when an MM# is not provided)
  • UL or other national testing laboratory listing (required when: when an MM# is not provided)

Confidence: Medium (0.75)

Source(s): Solar Permit

Inspection steps

Not yet verified.

Eligibility constraints

  • Property types: residential, townhome
  • Max system size (AC): Not yet verified.
  • Max system size (DC): 20 kW
  • Max thermal capacity: Not yet verified.
  • Program/pathway: Solar Quick Permit (HNL Build) / Expedited Clean Energy BPA for townhomes
  • Other conditions:
    • Standard Solar Quick Permits process even if the property is in a Special Management Area (SMA), Special District, subject to a Unilateral Agreement, subject to Ewa Highway Impact Fee, refers to DLNR, or is a Lot Flags Slide Lot — applicant must answer 'Yes' to the first HNL Build question to avoid being blocked by these flags
    • The separate expedited 'Clean Energy' Building Permit Application pathway (Revised Ordinances of Honolulu Section 18-5-10) is limited to 20 kW systems and primarily targets townhomes; eligible project types include solar PV (with or without energy storage), solar thermal/electric hot water heating, and EV charging stations

Confidence: High (0.8)

Source(s): Solar Permit, Clean Energy (Expedited Building Permit Application)

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Honolulu?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.

Sources

Frequently Asked Questions

What utility serves solar customers in Honolulu, Hawaii?

Hawaiian Electric Company (HECO) is the interconnection and distribution utility for Honolulu. The default electricity generation supplier is Hawaiian Electric Company (HECO), a utility, separate from Hawaiian Electric Company (HECO).

What documents are required for a solar permit in Honolulu?

Commonly required documents include: Manufacturer Specification Sheet; Installation and Operations Manual; UL or other national testing laboratory listing.

Who do I contact about solar permits in Honolulu?

DPP HNL Build Support, email HNLBuild@honolulu.gov.