Lebanon Solar Permit Guide
Eversource territory · Grafton County
Overview
GridPermit collects New Hampshire residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Not yet verified.
Per the City's own page: 'Please allow two weeks for the initial review of your application.' The page also clarifies that an application is not itself a permit — work cannot begin until the permit is actually issued.
Battery/solar incentive program on record
No battery/storage incentive program is on record for this locality.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Eversource
Generation supplier
Eversource (utility)
No Community Choice Aggregator was found serving Lebanon's residential solar customers this session; Eversource is recorded as both the distribution and default generation utility.
Interconnection
https://www.energy.nh.gov/renewable-energy/net-metering-and-group-net-metering/net-metering
Per the New Hampshire Department of Energy's own page: net metering is available to customers of Eversource, Liberty Utilities, New Hampshire Electric Cooperative, and Unitil. For residential and small commercial customers, the equipment's peak generating capacity is limited to 100kW AC, must be located behind the customer's meter, and must be interconnected and operating in parallel with the grid, used primarily to offset the customer's own usage. Compensation specifics vary by utility and project details per the state's Net Metering Tariff.
Required documents
- Solar Array Permit Application (required when: always)
- Site plan (required when: ground-mounted systems)
- Engineer design plan (required when: always)
- Mandatory pre-permit meeting (required when: homeowners performing their own electrical work)
Inspection steps
- Inspections are scheduled and coordinated with staff through the City's Online Permit Portal
Eligibility constraints
- Property types: residential
- Max system size (AC): 100 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Not yet verified.
- Other conditions:
- The 100kW AC figure recorded here reflects the statewide net-metering peak-capacity threshold for residential/small commercial customers (per the NH Department of Energy's own page), not a separate City permit-eligibility limit
Official contacts
- Planning and Development Department, phone: 603-448-1524, official website
Need a solar installer who handles permits in Lebanon?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Solar Array Permit, City of Lebanon, NH (government). Accessed 2026-08-13.
- Net Metering, New Hampshire Department of Energy (government). Accessed 2026-08-13.
Frequently Asked Questions
What utility serves solar customers in Lebanon, New Hampshire?
Eversource is the interconnection and distribution utility for Lebanon. The default electricity generation supplier is Eversource, a utility, separate from Eversource.
How long does a residential solar permit take in Lebanon?
Per the City's own page: 'Please allow two weeks for the initial review of your application.' The page also clarifies that an application is not itself a permit — work cannot begin until the permit is actually issued.
What documents are required for a solar permit in Lebanon?
Commonly required documents include: Solar Array Permit Application; Site plan; Engineer design plan; Mandatory pre-permit meeting.
Who do I contact about solar permits in Lebanon?
Planning and Development Department, phone 603-448-1524.