Electric utility
Pacific Gas and Electric Company (PG&E)Source linked
Review time
0–3 daysSee source scope and conditions below.
See your permit path

Alameda County · Explore related utility guides

Source healthLast verified 2026-08-0910 official sources4 of 6 core facts verified
Jump to a section
Informational only. This page is not legal, engineering, or permit advice. Every fact below links to the official source it came from and shows how confident we are in it. Verify current requirements with City of Fremont Community Development Department — Planning, Building & Permit Services and PG&E before making a decision.

Research coverage

Your permit path,
at a glance.

This shows what GridPermit has verified for Fremont. It does not show the status of a specific project.

  1. 01Permit authorityCity of Fremont Community Development Department — Planning, Building & Permit ServicesAuthority sourced
  2. 02DocumentsNo complete checklist on fileNot verified
  3. 03InspectionInspection guidance for FremontSteps sourced
  4. 04Utility & PTOPacific Gas and Electric Company (PG&E)Utility path sourced

01 / Know your path

Two approvals.
One project.

Local authority

Permit & inspection

City of Fremont Community Development Department — Planning, Building & Permit Services

Local requirements
Electric utility

Interconnection & PTO

Pacific Gas and Electric Company (PG&E)

Utility requirements

A local permit and utility permission to operate are different approvals. Check the local sequence and requirements below.

How to read this guide

GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.

Permit timeline

0–3 days

Same-day approval for over-the-counter/Instant Solar Permit (ISP) applications; up to 3 days for other standard expedited applications, per Fremont Municipal Code Ch. 15.63. See eligibility_constraints for the system-size and property-type scope this applies to; non-qualifying or larger systems may require standard plan review with a longer, unconfirmed timeline.

Sources & confidence

Confidence: High (0.85)

Source(s): Fremont Municipal Code Chapter 15.63 - Small Residential Rooftop Solar Systems

Battery/solar incentive program on record

California SGIP - current category and budget check required

New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.

Status on file: unknown. Verify current status before relying on this.

Sources & confidence

Confidence: High (0.9)

Source(s): Self-Generation Incentive Program (SGIP), SGIP - Statewide Announcements / About, 2026 Self-Generation Incentive Program Handbook, SGIP Program Metrics and Incentive Step Tracker

02 / Prepare your application

What you need.

Not yet verified.

Permit fees

Fremont Municipal Code Ch. 15.63 states fees are 'established by resolution' (Master Fee Schedule, Reso. 8672) rather than fixed in the code text. Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Not yet verified.

Rebates on record

Rebates on record

Not yet verified.

Utility and generation supplier

Utility

Pacific Gas and Electric Company (PG&E)

PG&E is confirmed as the transmission/distribution, billing, and interconnection utility of record for Fremont. See generation_supplier for the electricity generation supplier, which is a separate CCA entity (Ava Community Energy), not PG&E, by default.

Sources & confidence

Confidence: High (0.9)

Source(s): SGIP - Contact, Green Electricity

Generation supplier

Ava Community Energy (formerly East Bay Community Energy / EBCE) - 'Bright Choice' product (Community Choice Aggregator)

Fremont residents and businesses are automatically enrolled in Ava's Bright Choice product as their default electricity generation supplier, with the option to opt up to a cleaner product or opt out back to PG&E generation. PG&E remains the transmission/distribution entity and billing agent for both PG&E's and Ava's customers regardless of which generation supplier is used.

Sources & confidence

Confidence: High (0.9)

Source(s): Green Electricity

Interconnection

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Some supporting official material could not be independently confirmed from the full source in GridPermit's latest review. Verify the current requirement with the authority before relying on it.

Confidence: Medium (0.6)

Permit authority

City of Fremont Community Development Department — Planning, Building & Permit Services

Confirmed via direct retrieval of the Instant Solar Permit (ISP) page, which is hosted under this department's section of the city website and lists Development Services staff as the contact.

Sources & confidence

Confidence: High (0.9)

Source(s): Instant Solar Permit (ISP)

Permit page: https://www.fremont.gov/government/departments/community-development/planning-building-permit-services/planning-building-permits/permit-types/instant-solar-permit-isp

Inspection steps

  • One inspection required and performed for qualifying expedited/ISP small residential rooftop solar systems (Fremont Municipal Code Ch. 15.63)
  • Re-inspection authorized if the initial inspection fails

Applies to qualifying small residential rooftop systems only — see eligibility_constraints for the exact scope. Does not describe the process for non-qualifying/larger systems.

Sources & confidence

Confidence: High (0.85)

Source(s): Fremont Municipal Code Chapter 15.63 - Small Residential Rooftop Solar Systems

Eligibility constraints

  • Property types: single-family, duplex
  • Max system size (AC): 10 kW
  • Max system size (DC): Not yet verified.
  • Max thermal capacity: 30 kW
  • Program/pathway: Fremont Municipal Code Ch. 15.63 (Small Residential Rooftop Solar Systems) / Instant Solar Permit (ISP) via SolarAPP+
Sources & confidence

Confidence: High (0.85)

Source(s): Fremont Municipal Code Chapter 15.63 - Small Residential Rooftop Solar Systems

Official contacts

Official contacts

Confidence: High (0.85)

Need a solar installer who handles permits in Fremont?

EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.

Compare quotes from solar installers →

You'll continue on EnergySage's website. GridPermit links to EnergySage as an independent third-party resource. This link is not currently tracked for compensation.

Official sources

Official sources

Frequently Asked Questions

What utility serves solar customers in Fremont, California?

Pacific Gas and Electric Company (PG&E) is the interconnection and distribution utility for Fremont. The default electricity generation supplier is Ava Community Energy (formerly East Bay Community Energy / EBCE) - 'Bright Choice' product, a Community Choice Aggregator (CCA), separate from Pacific Gas and Electric Company (PG&E).

How long does a residential solar permit take in Fremont?

Same-day approval for over-the-counter/Instant Solar Permit (ISP) applications; up to 3 days for other standard expedited applications, per Fremont Municipal Code Ch. 15.63. See eligibility_constraints for the system-size and property-type scope this applies to; non-qualifying or larger systems may require standard plan review with a longer, unconfirmed timeline.

Who do I contact about solar permits in Fremont?

City of Fremont Development Services (Community Development Dept.), phone 510-284-4000, email developmentservices@fremont.gov.