Loma Linda Solar Permit Guide
Southern California Edison (SCE) territory · San Bernardino County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
15–30 days
The city's general permit FAQ states more complex projects typically require 15 to 30 working days, though simpler installations may process faster; this is a general figure, not solar-specific.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
- Building permit fee (general, varies by project scope): $39.5 (flat)
The city's general FAQ states fees range 'from $39.50 and up' depending on project scope; not a solar-specific figure.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
Generation supplier
Not yet verified.
Interconnection
SCE's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other SCE-territory records this session.
Required documents
- Panel layout and electrical schematics (required when: always)
- Engineering certification verifying existing roof structure can support additional dead load (required when: always)
- Preliminary site plan/plot plan showing size and shape of the property (required when: always)
Inspection steps
- Call 909-799-2830 or 909-799-2836 to schedule/confirm inspections
- Inspections conducted 11:00 AM-1:00 PM
Eligibility constraints
Not yet verified.
Official contacts
- City of Loma Linda Building Division, phone: 909-799-2836, official website
- SGIP Program Administrator (SCE territory), email: SGIPGroup@sce.com, official website
Paid referral disclosure: GridPermit has a paid referral relationship with CompareSolarPrices. If you use this link and later complete a qualifying action, GridPermit may receive compensation.
Want a solar quote after reviewing the permit requirements in Loma Linda?
Continue to CompareSolarPrices to request a homeowner solar quote for Loma Linda.
You will continue on CompareSolarPrices' website. GridPermit is not the installer.
Sources
- Building and Safety FAQ's, City of Loma Linda (government). Accessed 2026-08-08.
- Incorporated Cities and Counties Served by SCE, Southern California Edison (utility). Accessed 2026-08-08.
- Net Energy Metering (NEM) Time of Use, Southern California Edison (utility). Accessed 2026-08-03.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Loma Linda, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Loma Linda.
How long does a residential solar permit take in Loma Linda?
The city's general permit FAQ states more complex projects typically require 15 to 30 working days, though simpler installations may process faster; this is a general figure, not solar-specific.
What documents are required for a solar permit in Loma Linda?
Commonly required documents include: Panel layout and electrical schematics; Engineering certification verifying existing roof structure can support additional dead load; Preliminary site plan/plot plan showing size and shape of the property.
Who do I contact about solar permits in Loma Linda?
City of Loma Linda Building Division, phone 909-799-2836.
Related California cities
Other verified cities related to Loma Linda. See all cities on the California solar permit guide index.
- Apple Valley, Southern California Edison (SCE)
- Barstow, Southern California Edison (SCE)
- Chino, Southern California Edison (SCE)
- Chino Hills, Southern California Edison (SCE)
- Colton, City of Colton Electric Utility
- Fontana, Southern California Edison (SCE)