Santa Monica Solar Permit Guide
Southern California Edison (SCE) territory · Los Angeles County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
Same-day review for eligible expedited-permit projects
No verified standard-path permit timeline is available.
Per the city's own page: 'Permits issue immediately upon fee payment completion' for eligible SolarAPP+ submissions.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
- SolarAPP+ administrative fee: $25 (flat)
City permit fees are additionally charged at standard solar permit rates; no specific city fee dollar amount was given on this page.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
Generation supplier
Clean Power Alliance (CPA) - 100% Green Power (default) (Community Choice Aggregator)
Confirmed via a directly-fetched California Community Choice Association (CalCCA) press release: Santa Monica is explicitly named among the communities on 100% Green Power as their default CPA energy option. Customers may choose another CPA option or opt out at any time.
Interconnection
SCE's own Net Energy Metering (NEM) program page — a utility-wide fact already established for other SCE-territory records this session.
Required documents
- SolarAPP+ approval ID number (required when: always)
- SolarAPP+ approval document (required when: always)
- Project plans, details, and specifications (required when: always)
Inspection steps
- Schedule inspections through einspections.smgov.net after permit issuance
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ (via Santa Monica Citizen Access Portal)
- Other conditions:
- Main dwelling roof-mounted residential structures only — no ballasted, ground-mounted, or building-integrated systems eligible
- No new construction projects
- Only contractors licensed and registered with SolarAPP+ may apply (no permit expeditors)
- Panel/electrical service upgrades allowed up to 400 amps maximum
Official contacts
- SGIP Program Administrator (SCE territory), email: SGIPGroup@sce.com, official website
Need a solar installer who handles permits in Santa Monica?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Eight more Clean Power Alliance Communities Choose 100% Green Power as their primary energy option, California Community Choice Association (CalCCA) (other_official). Accessed 2026-08-06.
- Incorporated Cities and Counties Served by SCE, Southern California Edison (utility). Accessed 2026-08-06.
- How to Submit for Automated Solar Panel Permits, City of Santa Monica (government). Accessed 2026-08-06.
- Net Energy Metering (NEM) Time of Use, Southern California Edison (utility). Accessed 2026-08-03.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Santa Monica, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Santa Monica. The default electricity generation supplier is Clean Power Alliance (CPA) - 100% Green Power (default), a Community Choice Aggregator (CCA), separate from Southern California Edison (SCE).
How long does an expedited-eligible residential solar permit take in Santa Monica?
Per the city's own page: 'Permits issue immediately upon fee payment completion' for eligible SolarAPP+ submissions. No verified standard-path permit timeline is available.
What documents are required for a solar permit in Santa Monica?
Commonly required documents include: SolarAPP+ approval ID number; SolarAPP+ approval document; Project plans, details, and specifications.
Who do I contact about solar permits in Santa Monica?
SGIP Program Administrator (SCE territory), email SGIPGroup@sce.com.
Related California cities
Other verified cities related to Santa Monica. See all cities on the California solar permit guide index.
- Alhambra, Southern California Edison (SCE)
- Arcadia, Southern California Edison (SCE)
- Azusa, Azusa Light & Water
- Baldwin Park, Southern California Edison (SCE)
- Beverly Hills, Southern California Edison (SCE)
- Burbank, Burbank Water and Power (BWP)