Sierra Madre Solar Permit Guide
Southern California Edison (SCE) territory · Los Angeles County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Southern California Edison (SCE)
Generation supplier
Clean Power Alliance (CPA) - 100% Green Power (default since October 2020) (Community Choice Aggregator)
Per Clean Power Alliance's own co-branded notice with the City of Sierra Madre: 'Clean Power Alliance has been the electricity provider for the City of Sierra Madre since 2019... As of October 2020, Sierra Madre residents and businesses are receiving 100% Green Power (100% renewable energy) as their default rate product. The Sierra Madre City Council voted in February 2020 to adopt Clean Power Alliance's 100% Green Power as the default rate.' Customers may switch to CPA's Lean Power (36% renewable) or Clean Power (50% renewable) tiers at no cost.
Interconnection
SCE's own Net Energy Metering (NEM) program page — a utility-wide fact (same URL applies to every city in SCE's distribution territory, including Sierra Madre), already established for the Irvine and Fullerton records this session. sce.com returned a DNS-level failure to automated fetch; the URL is confirmed to exist under this exact title on SCE's own domain via search engine indexing.
Required documents
- Three sets of plans, including site/plot plan (required when: always)
- Manufacturer specification sheets, installation instructions, and U.L. listings attached to the plans (required when: always)
- Plans signed by a State of California licensed contractor (classification A, B, C-46, or C-10), licensed electrical engineer, or licensed architect, with signature and license number on each sheet (required when: always)
- Owner's name and address on all plan sheets, specific to the project (required when: always)
- Signed and dated 'Structural Guideline for Plan Check Submittal on Solar Panel Support' form (required when: always)
- Roof plan showing location/dimensions of PV equipment and arrays, partial roof framing plan (rafter/beam/header size, span, spacing), roofing materials, and support/flashing details (required when: always)
- Electrical drawings (2007 CEC compliance), single line diagram, inverter information, PV module information, and required system labels/warnings per NEC Article 690 (required when: always)
Inspection steps
- One inspection is required for small residential rooftop solar energy systems eligible for expedited review, performed by the Building Division
- Inspection is scheduled within two (2) business days of a request
- Do not connect the solar voltaic system to the main power supply until after final approval by the city inspector
Eligibility constraints
- Property types: residential
- Max system size (AC): Not yet verified.
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Small Residential Rooftop Solar (Building Division expedited review)
- Other conditions:
- Applies to 'small residential rooftop installations less than 10KW (kilowatts) in size' — source did not specify AC vs. DC
- No engineer's report/calculation required if: existing roofing material weighs 4 lb/sq ft or less (max 2 layers asphalt shingle or composition roofing); existing roof rafter/joist span does not exceed specified limits (e.g. 2x4 at 24" o.c. up to 6'-11", 2x6 at 16" o.c. up to 12'-6"); and the solar module/mounting system's distribution weight does not exceed 3 lb/sq ft
- Property owner must install and maintain a metering system enabling compliance with the City of Sierra Madre's tax on cogenerated electricity (Sierra Madre Municipal Code Section 3.36.060) — a local municipal tax distinct from any building permit fee, with tax collected monthly and remitted by the property owner
Official contacts
- City of Sierra Madre Building Official, Planning & Community Preservation Department, phone: (626) 355-7138, official website
- SGIP Program Administrator (SCE territory), email: SGIPGroup@sce.com, official website
Need a solar installer who handles permits in Sierra Madre?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Residential Solar Plan Check Submittal Checklist (Solar Voltaic System) - City of Sierra Madre, City of Sierra Madre, Planning & Community Preservation Department, Building Division (government). Accessed 2026-08-03.
- Your Rate Options - Notice to Sierra Madre Residents, Clean Power Alliance (other_official). Accessed 2026-08-03.
- Sierra Madre city, California; Los Angeles County, California - QuickFacts, U.S. Census Bureau (other_official). Accessed 2026-08-03.
- Net Energy Metering (NEM) Time of Use, Southern California Edison (utility). Accessed 2026-08-03.
- SGIP - Statewide Announcements / About, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- SGIP - Contact, Self-Generation Incentive Program (statewide administrator site) (program_administrator). Accessed 2026-08-01.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Sierra Madre, California?
Southern California Edison (SCE) is the interconnection and distribution utility for Sierra Madre. The default electricity generation supplier is Clean Power Alliance (CPA) - 100% Green Power (default since October 2020), a Community Choice Aggregator (CCA), separate from Southern California Edison (SCE).
What documents are required for a solar permit in Sierra Madre?
Commonly required documents include: Three sets of plans, including site/plot plan; Manufacturer specification sheets, installation instructions, and U.L. listings attached to the plans; Plans signed by a State of California licensed contractor (classification A, B, C-46, or C-10), licensed electrical engineer, or licensed architect, with signature and license number on each sheet; Owner's name and address on all plan sheets, specific to the project; Signed and dated 'Structural Guideline for Plan Check Submittal on Solar Panel Support' form; Roof plan showing location/dimensions of PV equipment and arrays, partial roof framing plan (rafter/beam/header size, span, spacing), roofing materials, and support/flashing details; Electrical drawings (2007 CEC compliance), single line diagram, inverter information, PV module information, and required system labels/warnings per NEC Article 690.
Who do I contact about solar permits in Sierra Madre?
City of Sierra Madre Building Official, Planning & Community Preservation Department, phone (626) 355-7138.
Related California cities
Other verified cities related to Sierra Madre. See all cities on the California solar permit guide index.
- Alhambra, Southern California Edison (SCE)
- Arcadia, Southern California Edison (SCE)
- Azusa, Azusa Light & Water
- Baldwin Park, Southern California Edison (SCE)
- Beverly Hills, Southern California Edison (SCE)
- Burbank, Burbank Water and Power (BWP)