Corte Madera Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Marin County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Permit timeline
3 days
Approximately 3 business days for standard plan review submissions.
Battery/solar incentive program on record
California SGIP - current category and budget check required
New applications and waitlist applications for ratepayer-funded SGIP budgets closed on December 30, 2025. New AB 209 applications have a June 30, 2028 deadline. The 2026 SGIP rate table publishes $3.10/W for solar and $1.10/Wh for storage in applicable Residential Solar and Storage Equity categories. Household eligibility and live budget availability vary by category and program administrator; check the official Program Metrics tracker before relying on an incentive.
Status on file: unknown. Verify current status before relying on this.
Permit fees
Not yet verified.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
MCE (Marin Clean Energy) (Community Choice Aggregator)
MCE's own service-area page confirms Corte Madera as one of Marin County's member communities. PG&E continues to deliver the power and provide billing/customer service.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- Eligibility checklist (required when: always)
- Standard plans (central/string inverter or microinverter systems) (required when: conditional)
- Structural criteria compliance documentation (required when: always)
Inspection steps
Not yet verified.
Eligibility constraints
- Property types: residential
- Max system size (AC): 10 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: Symbium automated permitting platform (SB 379 compliant, launched September 30, 2024)
- Other conditions:
- Streamlined pathway covers solar PV installations 10kW or less for one- and two-family dwellings
- Traditional applications for systems outside the automated process go to buildingpermit@cortemadera.gov
Official contacts
- Town of Corte Madera Building Division, phone: 415-927-5062, email: buildingpermit@cortemadera.gov, official website
Need a solar installer who handles permits in Corte Madera?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- Solar Photovoltaic Permitting, Town of Corte Madera (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- Service Area, MCE (Marin Clean Energy) (other_official). Accessed 2026-08-08.
- About, Self-Generation Incentive Program (SGIP) (cpuc). Accessed 2026-08-09.
- 2026 Self-Generation Incentive Program Handbook, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
- SGIP Program Metrics and Incentive Step Tracker, Self-Generation Incentive Program Program Administrators (program_administrator). Accessed 2026-08-26.
Frequently Asked Questions
What utility serves solar customers in Corte Madera, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Corte Madera. The default electricity generation supplier is MCE (Marin Clean Energy), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
How long does a residential solar permit take in Corte Madera?
Approximately 3 business days for standard plan review submissions.
What documents are required for a solar permit in Corte Madera?
Commonly required documents include: Eligibility checklist; Standard plans (central/string inverter or microinverter systems); Structural criteria compliance documentation.
Who do I contact about solar permits in Corte Madera?
Town of Corte Madera Building Division, phone 415-927-5062, email buildingpermit@cortemadera.gov.
Related California cities
Other verified cities related to Corte Madera. See all cities on the California solar permit guide index.
- Fairfax, Pacific Gas & Electric (PG&E)
- Larkspur, Pacific Gas & Electric (PG&E)
- Mill Valley, Pacific Gas & Electric (PG&E)
- Novato, Pacific Gas & Electric (PG&E)
- Ross, Pacific Gas & Electric (PG&E)
- San Anselmo, Pacific Gas & Electric (PG&E)