Gilroy Solar Permit Guide
Pacific Gas & Electric (PG&E) territory · Santa Clara County
Overview
GridPermit collects California residential solar and permitting facts directly from official sources (city, county, and state government sites, utilities, and public utilities commissions) and shows only what we can verify, with a confidence score and a link to where it came from. Nothing here is estimated or inferred beyond what's stated below. See our methodology for the rules this page follows.
Battery/solar incentive program on record
No battery/storage incentive program is on record for this locality.
Permit fees
- Solar PV permit (15kW or less): $450 (flat)
- Solar PV permit (over 15kW): $500 (flat)
Plus $15/kW above 15kW.
- Energy Storage System permit: $103.27 (flat)
- ESS building inspection: $146.77 (flat)
Plus hourly rate.
- ESS fire inspection (>50kWh): $260 (flat)
Plus hourly rate.
- Revision fee: $137.03 (flat)
Plus divisional hourly rate.
Rebates
Not yet verified.
Utility and generation supplier
Utility
Pacific Gas & Electric (PG&E)
Generation supplier
Silicon Valley Clean Energy (SVCE) (Community Choice Aggregator)
SVCE's own 'The Agency' page confirms Gilroy as one of 13 member jurisdictions. PG&E continues to deliver the power and provide billing/customer service.
Interconnection
https://www.pge.com/en/save-energy-and-money/rebates-and-incentives/nem.html
PG&E's own utility-wide Net Energy Metering (NEM) program page.
Required documents
- Manufacturer specifications for all components (required when: always)
- Completed electrical plan with single-line diagram (module counts, inverter details, grounding specs) (required when: always)
- Roof plan with fire safety items and code-compliant access pathways (required when: always)
- Structural documentation (engineer-stamped for non-standard systems) (required when: conditional)
- Smoke detector and carbon monoxide self-certification form (required when: always)
- Water conserving plumbing fixture compliance form (required when: always)
Inspection steps
- Request inspections online or via Inspect@CityofGilroy.org, providing permit number, address, inspection type, and preferred date/time
- Inspections are scheduled 72 hours out for all appointments
- Same-day cancellations incur reinspection fees
Eligibility constraints
- Property types: residential
- Max system size (AC): 38.4 kW
- Max system size (DC): Not yet verified.
- Max thermal capacity: Not yet verified.
- Program/pathway: SolarAPP+ (roof-mounted, retrofit systems up to 38.4kW)
- Other conditions:
- Systems up to 38.4kW qualify for automated permitting without separate planning or fire service reviews
- All roof-mounted installations must meet California State Fire Marshall requirements, verified through plan checks and inspections
Official contacts
- City of Gilroy Building and Safety Division, phone: 408-846-0451, email: Inspect@CityofGilroy.org, official website
Need a solar installer who handles permits in Gilroy?
EnergySage is an independent solar marketplace where you can request property-specific pricing from installers familiar with local permitting.
Compare quotes from solar installers →You'll continue on EnergySage's website. GridPermit has a partner relationship with EnergySage; this link is not currently tracked, and whether the partnership results in compensation to GridPermit has not yet been confirmed.
Sources
- SolarApp+ for Residential Solar Installers, City of Gilroy (government). Accessed 2026-08-08.
- Net Energy Metering (NEM), Pacific Gas & Electric (utility). Accessed 2026-08-08.
- The Agency, Silicon Valley Clean Energy (other_official). Accessed 2026-08-08.
Frequently Asked Questions
What utility serves solar customers in Gilroy, California?
Pacific Gas & Electric (PG&E) is the interconnection and distribution utility for Gilroy. The default electricity generation supplier is Silicon Valley Clean Energy (SVCE), a Community Choice Aggregator (CCA), separate from Pacific Gas & Electric (PG&E).
What documents are required for a solar permit in Gilroy?
Commonly required documents include: Manufacturer specifications for all components; Completed electrical plan with single-line diagram (module counts, inverter details, grounding specs); Roof plan with fire safety items and code-compliant access pathways; Structural documentation (engineer-stamped for non-standard systems); Smoke detector and carbon monoxide self-certification form; Water conserving plumbing fixture compliance form.
Who do I contact about solar permits in Gilroy?
City of Gilroy Building and Safety Division, phone 408-846-0451, email Inspect@CityofGilroy.org.
Related California cities
Other verified cities related to Gilroy. See all cities on the California solar permit guide index.
- Campbell, Pacific Gas & Electric (PG&E)
- Cupertino, Pacific Gas & Electric (PG&E)
- Los Gatos, Pacific Gas & Electric (PG&E)
- Milpitas, Pacific Gas and Electric Company (PG&E)
- Monte Sereno, Pacific Gas & Electric (PG&E)
- Morgan Hill, Pacific Gas & Electric (PG&E)